About the project

Construction of six new social housing units at 28 rue Huguenin, Mulhouse, including two T3 (70 m²), two T4 (80 m²) and two T5 (100 m²+) units. The project covers full architectural and engineering design services from schematic design to post-occupancy evaluation, plus optional construction supervision and planning coordination.

Scope of work

Full architectural and engineering design services for six new social housing units, including schematic design (ESQ), preliminary design (APS), detailed design (APD), construction documents (PRO), assistance with tendering (ACT), construction supervision (EXE), project management (DET) and post-occupancy evaluation (AOR). Optional services include construction supervision (OPC) and planning coordination (PLN).

Deliverables

  • schematic design (ESQ)
  • preliminary design (APS)
  • detailed design (APD)
  • construction documents (PRO)
  • assistance with tendering (ACT)
  • construction supervision (EXE)
  • project management (DET)
  • post-occupancy evaluation (AOR)
  • optional construction supervision (OPC)
  • optional planning coordination (PLN)

Required services

  • architectural design
  • engineering design
  • construction documentation
  • tendering assistance
  • construction supervision
  • project management
  • post-occupancy evaluation

Pelenoir assessment

The project primarily involves architectural design for six new social housing units, supported by engineering and technical planning services. Secondary scope includes project and construction management tasks such as supervision and post-occupancy evaluation.

  • Architectural concept, building design, and full design services for six new social housing units, including schematic design, preliminary design, detailed design, and construction documents.

  • Structural, civil, and building-services engineering design, including technical planning and coordination for the residential project.

  • Construction supervision, project management, and post-occupancy evaluation for the housing project.

How to take part

Who can apply

  • Refer to the consultation regulations (règlement de la consultation)

What to submit

  • Refer to the consultation regulations (règlement de la consultation)

Award criteria

  • Price of services: 40 points
  • Technical value: 40 points
  • Environmental performance: 20 points

Source

Published on BOAMP. Original title: Mission de maîtrise d'œuvre relative à la construction de 6 logements 28 rue Huguenin à Mulhouse.

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.