Architecture · Service contract
Shooting range construction design and cost documentation in Zahutyń
Preparation of complete design and cost documentation for the construction of a shooting range in Zahutyń, including obtaining a valid building permit or notification of construction works, and providing authorial supervision.
- Deadline
- Closed 45 days ago
- Location
- Zagórz, Podkarpackie, Poland
About the project
Preparation of complete design and cost documentation for the construction of a shooting range in Zahutyń, including obtaining a valid building permit or notification of construction works, and providing authorial supervision.
Scope of work
Preparation of complete design and cost documentation for a shooting range, including architectural, engineering, and planning services, as well as authorial supervision. The documentation must enable obtaining a valid building permit or notification of construction works.
Deliverables
- Complete design documentation for building permit or construction works notification
- Cost documentation
- Authorial supervision
Required services
- Architectural design services
- Engineering design services
- Project planning services
- Spatial planning and land development services
- Project and documentation supervision
Pelenoir assessment
The project involves the preparation of complete design and cost documentation for a shooting range, requiring a combination of architectural design, engineering, and project supervision. The primary focus is on architectural and building design, supported by structural and technical engineering, as well as authorial supervision to ensure compliance with the approved plans.
-
Architecture 50%
Architectural concept and building design for the shooting range, including spatial arrangement, functional layout, and compliance with regulatory requirements for sports facilities.
-
Engineering 30%
Structural, civil, and technical engineering for the shooting range, including load-bearing elements, infrastructure integration, and compliance with safety and technical standards.
-
Authorial supervision during the design and construction phases to ensure compliance with the approved design documentation and regulatory requirements.
How to take part
Who can apply
- Experience in preparing design documentation or construction projects for cubature buildings in the last 5 years (minimum 5 services)
- At least one person with unlimited construction design licenses in structural-engineering or architectural specialties, with minimum 24 months of experience in the obtained specialty
What to submit
- Electronic offer submission via e-Zamówienia platform
- Completed offer form (Załącznik nr 10 do SWZ - Formularz ofertowy)
- Statutory declarations and statements as specified in the tender documents
Award criteria
- Price (60% weight)
- Professional experience of the designer (40% weight)
Tender documents
The visible document package includes a set of tender documents, forms, and attachments. The ZIP file labeled 'Załącznik Nr 1 do SWZ - Opis Przedmiotu Zamówienia' likely contains detailed project specifications, plans, or drawings related to the shooting range design. The PDF file 'SWZ.pdf' is expected to be the main tender specification document outlining the procurement rules and requirements. The DOCX files include various forms such as offer templates, declarations, and contractual attachments, which are necessary for submission and compliance with the tender process. The exact contents of the ZIP file remain uncertain as its internal files were not observed.
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowo kosztorysowej budowy strzelnicy w Zahutyniu.
Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 6 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.