About the project

Preparation of design documentation for new waste collection points (MZO) in the Sępolno district of Wrocław, including architectural, structural, road, and utility designs, along with authorial and dendrological supervision during construction.

Scope of work

Preparation of full design documentation for new waste collection points (MZO) in the Sępolno district, including architectural, structural, road, utility, and landscape designs, along with authorial and dendrological supervision during construction. The project covers geodetic plots in the Sępolno area of Wrocław.

Deliverables

  • Design documentation for waste collection points (MZO)
  • Architectural designs for buildings and infrastructure
  • Structural engineering designs
  • Road and utility designs (thermal, ventilation, gas, water, sewage, electrical)
  • Landscape and dendrological designs
  • Authorial supervision documentation
  • Dendrological supervision documentation

Required services

Pelenoir assessment

The project involves the design and supervision of waste collection points (MZO) in Wrocław, covering architectural design, structural and utility engineering, landscape architecture, and construction supervision. The primary focus is on architectural and engineering design, with additional landscape and project management components.

  • Architectural design of waste collection points (MZO) buildings and associated infrastructure, including conceptual and detailed design documentation.

  • Structural, road, and utility engineering designs (thermal, ventilation, gas, water, sewage, electrical) for the waste collection points and surrounding infrastructure.

  • Landscape and dendrological design for the outdoor areas surrounding the waste collection points, including planting and green space integration.

  • Authorial supervision during construction to ensure compliance with the design documentation and coordination of project execution.

How to take part

Who can apply

  • At least one person with unlimited architectural design qualifications and 3 years of experience
  • At least one person with unlimited road design qualifications and 3 years of experience
  • At least one person with unlimited structural engineering qualifications and 3 years of experience
  • At least one person with unlimited utility design qualifications (thermal, ventilation, gas, water, sewage) and 3 years of experience
  • At least one person with unlimited electrical engineering design qualifications and 3 years of experience
  • At least one person for dendrological supervision with qualifications as: inspector of green areas, landscape architect (with 3 years of experience), or technician (with 5 years of experience)
  • Experience in preparing at least one design documentation for external area development in a conservation-protected area within the last 3 years

What to submit

  • Offer in electronic form (PDF preferred)
  • Qualified electronic signature or trusted signature
  • Documents describing team qualifications and experience
  • References or certificates for completed projects
  • Declaration of no exclusion grounds (Załącznik nr 5 do SWZ)
  • List of persons assigned to the project (Załącznik nr 9 do SWZ)
  • List of completed services (Załącznik nr 8 do SWZ)

Award criteria

  • Price (80% weight)
  • Experience (20% weight)

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej dla budowy MZO Sępolno Północ, w obszarze ulic: Jezierskiego, Mickiewicza, Konarskiego, Kosynierów gdyńskich we Wrocławiu wraz z pełnieniem nadzoru autorskiego.

Summary and assessment prepared by Pelenoir from the public notice (30 Oct 2026). The original notice and its documents are binding. Page updated 29 Oct 2026.