About the project

Design and documentation for the construction of a new wing of a primary school with a preschool section in Rączna, including site development, demolition of existing structures, and authorial supervision during construction. The project includes architectural, construction, and technical designs, as well as obtaining necessary permits and approvals.

Scope of work

The project involves preparing comprehensive multi-discipline design documentation, obtaining required permits and approvals, securing a building permit (or effective construction notification), and providing authorial supervision during construction. The scope includes conceptual site development, architectural and technical designs, demolition of existing structures, and preparation of tender materials.

Deliverables

  • Complete multi-discipline design documentation
  • Tender materials
  • Concept for site development including building layout, communication systems, technical installations, and green areas
  • Building permit or effective construction notification
  • Authorial supervision during construction
  • Demolition of existing structures conflicting with the planned investment

Required services

Pelenoir assessment

This project primarily involves the design and documentation for a new school wing, with a strong focus on architectural design and engineering services. The scope explicitly requires architectural concept development, site planning, and technical engineering for structural and infrastructure systems. Additionally, project management tasks such as authorial supervision and permit coordination are included, though these represent a smaller share of the overall scope.

  • Architectural concept, building design, and preparation of comprehensive architectural documentation for the new school wing, including layout, spatial organization, and aesthetic integration with the existing facility. This includes conceptual site development and coordination of architectural elements with technical and construction requirements.

  • Structural, civil, and technical engineering design for the school wing, including infrastructure systems, technical installations, and coordination of engineering disciplines to ensure compliance with building regulations and functional requirements. This also includes preparation of technical documentation for permits and construction.

  • Authorial supervision during construction, coordination of permit acquisition, and preparation of tender materials to ensure the design is implemented according to specifications. This includes overseeing the integration of architectural and engineering designs during the construction phase.

How to take part

Who can apply

  • Execution of at least one similar design project (documentation with a valid building permit) for a building with a volume of at least 3000 m³ within the last 3 years
  • Availability of at least one designer with architectural design qualifications (or equivalent) for the project

What to submit

  • Completed offer form (Załącznik nr 1 do SWZ)
  • Power of attorney (if applicable)
  • Statement on exclusion criteria and fulfillment of participation conditions (Załącznik nr 2 do SWZ)
  • Commitment from resource-sharing entities (if applicable, Załącznik nr 8 do SWZ)
  • List of executed services (Załącznik nr 4 do SWZ)
  • List of personnel assigned to the project (Załącznik nr 5 do SWZ)

Award criteria

  • Price (60% weight)
  • Length of warranty and guarantee period (40% weight)

Tender documents

The visible document package includes 11 files, primarily PDFs and DOCs, labeled as the main tender notice, terms of reference (SWZ), and attachments (Załącznik nr 1 to 9). These likely contain the tender notice, detailed specifications for the design project, offer forms, statements on exclusion criteria, personnel and experience lists, and contractual conditions. Attachment nr 9 (PDF) may include the detailed scope of work, while other attachments likely provide templates for submissions and compliance documents. The exact content of the files cannot be confirmed without access, but the filenames suggest a focus on administrative, technical, and procedural requirements for the design project.

Source

Published on e-Zamowienia. Original title: „Budowa szkoły w Rącznej – projekt”.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 8 Oct 2026.