Engineering · Service contract
Schneiderau Hydropower Plant Revitalization
Revitalization of the Schneiderau hydropower plant, including replacement of two existing above-ground pressure pipelines with an underground pipeline (approx.
- Deadline
- Closed 61 days ago
- Location
- Austria
About the project
Revitalization of the Schneiderau hydropower plant, including replacement of two existing above-ground pressure pipelines with an underground pipeline (approx. 1,250 m, DN 1600–1800), and construction of a new powerhouse with associated hydraulic, mechanical, and electrical components. The project aims to extend the technical lifespan of key plant components.
Scope of work
Technical planning for the revitalization of the Schneiderau hydropower plant, including submission planning with an optional extension to tender and execution planning, construction supervision, and post-processing. The scope covers hydraulic, mechanical, and electrical engineering for the new powerhouse and underground pressure pipeline.
Deliverables
- submission planning (Einreichplanung)
- optional tender and execution planning
- construction supervision (Baubegleitung)
- post-processing documentation
Required services
- technical planning
- hydraulic engineering
- mechanical engineering
- electrical engineering
- civil engineering
Pelenoir assessment
The Schneiderau Hydropower Plant Revitalization project is primarily an engineering and technical planning endeavor, focusing on the replacement of pressure pipelines and the construction of a new powerhouse with associated hydraulic, mechanical, and electrical components. A secondary aspect involves construction supervision and documentation, which aligns with project and construction management.
-
Engineering 80%
Technical planning for the revitalization of the Schneiderau hydropower plant, including hydraulic, mechanical, and electrical engineering for the new powerhouse and underground pressure pipeline, as well as civil engineering for structural components.
-
Construction supervision (Baubegleitung) and post-processing documentation to ensure compliance with planning and execution phases.
How to take part
What to submit
- electronic submission via provia.at
- participation application (Teilnahmeantrag)
- project description
- planning documents
Award criteria
- technically and economically most advantageous offer
Tender documents
The visible documents likely include the general terms and conditions of ÖBB-Infrastruktur AG (oebb_AGB_DL_2021_01.pdf). The project description (02_Projektbeschreibung.pdf) probably outlines the hydropower plant revitalization, including technical and spatial requirements. The procurement fundamentals (01_Grundlagen des Vergabeverfahrens_Planer.pdf) may detail the legal and procedural framework for the planning services. The task specification (03_Aufgabenstellung_Planer.pdf) likely defines the scope of work, deliverables, and technical requirements for the planning phase. The participation form (01A_Teilnahmeantrag_Planer.pdf) is presumably required for submitting applications. The exact content of these files cannot be confirmed without access, and no drawings or models are explicitly visible in the file names.
Source
Published on Austrian Public Procurement Search. Original title: KW Schneiderau (Technische Planung) - Revitalisierung KW Schneiderau - Einreichplanung mit OPTION Ausschreibungs- und Ausführungsplanung.
Summary and assessment prepared by Pelenoir from the public notice (28 Sep 2026). The original notice and its documents are binding. Page updated 8 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.