About the project

Design and project management services for the construction of an extension to the sanitary unit at the Villenauxe-la-Grande detention centre.

Scope of work

Project management (maîtrise d'œuvre) services for the design and construction supervision of a sanitary unit extension at the Villenauxe-la-Grande detention centre. The project requires an architect as part of the bidding consortium. Plans will only be provided after a mandatory site visit and the return of a confidentiality agreement.

Deliverables

  • Project management services for sanitary unit extension
  • Confidentiality agreement submission
  • Participation in mandatory site visit

Required services

  • architectural design
  • construction supervision
  • waste management planning (reduction, valorisation, recycling, and sorting)

Pelenoir assessment

The project primarily involves architectural design for a sanitary unit extension at a detention centre, with secondary requirements for project and construction management services. The scope is explicitly focused on design and supervision, supported by the tender's emphasis on architectural involvement and project management deliverables.

  • Architectural design for the sanitary unit extension, including spatial planning, functional layout, and compliance with detention centre standards.

  • Project management and construction supervision for the sanitary unit extension, ensuring compliance with technical, environmental, and contractual requirements.

How to take part

Who can apply

  • Architect must be part of the bidding consortium
  • Compliance with social and environmental criteria
  • Demonstration of similar past project experience

What to submit

  • Confidentiality agreement
  • Curriculum vitae and qualifications
  • Technical proposal including human resources and environmental approach

Award criteria

  • Price of services (35%)
  • Technical value (55%) including human resources (20%) and synthesis note (35%)
  • Environmental approach in waste management (10%)

Source

Published on BOAMP. Original title: Maîtrise d'œuvre pour la création d'une extension de l'unité sanitaire au centre de détention de Villenauxe-la-Grande.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 10 Sep 2026.