About the project

Provision of local construction supervision services for the S3 Weinviertler Schnellstraße section between Göllersdorf and Großstelzendorf (km 14.086–17.031). The services ensure economical project realization, cost and schedule adherence, risk minimization, and compliance with technical standards.

Scope of work

Local construction supervision services for the S3 Weinviertler Schnellstraße section Göllersdorf–Großstelzendorf (km 14.086–17.031), ensuring economical project realization, cost and schedule adherence, risk minimization, and compliance with technical standards.

Deliverables

  • local construction supervision services

Required services

  • construction supervision
  • quality assurance
  • personnel deployment planning
  • reference project documentation

Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as it focuses exclusively on local construction supervision services for a highway infrastructure section. The scope does not include architectural design, engineering, or other AEC disciplines, but rather the oversight and management of construction activities.

  • Local construction supervision, including quality assurance, cost and schedule adherence, risk minimization, and compliance with technical standards for the highway section Göllersdorf–Großstelzendorf.

How to take part

Who can apply

  • Bidders must submit references for the ÖBA-Leiter (local construction supervisor) and deputy ÖBA-Leiter roles
  • Consortia allowed with a maximum of 2 members
  • Submissions must be in German

What to submit

  • Completed offer form (Deckblatt Angebot)
  • Personnel deployment plan (OeBA_Personaleinsatzplan)
  • Quality assurance catalogue (OeBA_Qualitaetssicherungskatalog)
  • Reference documentation (OeBA_Referenzen)
  • General contractual and tender conditions (D.1, D.4)
  • Project description (D.2_Projektbeschreibung)
  • Bill of quantities (D.5_LV)
  • Digital data carrier (D.5_Datenträger)

Award criteria

  • Price (net total price as per documents)
  • Quality (as per documents)
  • ÖBA-Leiter / Reference project A (weighted percentage)
  • ÖBA-Leiter / Reference project B (weighted percentage)
  • Deputy ÖBA-Leiter / Reference project A (weighted percentage)
  • ÖBA Technician EM / Reference project C (weighted percentage)
  • Gender parity (weighted percentage)

Tender documents

The visible document package includes PDF files likely containing general tender and contractual conditions (D.1, D.4), a project description (D.2_Projektbeschreibung), and a bill of quantities (D.5_LV). Additional files appear to cover personnel deployment planning (OeBA_Personaleinsatzplan), a quality assurance catalogue (OeBA_Qualitaetssicherungskatalog), and reference documentation (OeBA_Referenzen). A ZIP file (1.Berichtigung_Planbeilage.zip) likely contains corrected plans or drawings. The exact content of the ZIP file cannot be confirmed without access, but the filenames suggest technical and administrative tender documents.

Source

Published on Austrian Public Procurement Search. Original title: S3 SAB Göllersdorf - Großstelzendorf - Leistungen der Örtlichen Bauaufsicht.

Summary and assessment prepared by Pelenoir from the public notice (12 Nov 2026). The original notice and its documents are binding. Page updated 11 Nov 2026.