About the project

Geotechnical investigations for the planning phase of Highway 4 between Rovaniemi and Apukka, including soil sampling, survey point measurements, coordination with landowners, reporting, and potential water sampling and monitoring.

Scope of work

Geotechnical investigations for Highway 4 planning phase, including soil sampling, survey point measurements, coordination with landowners, reporting, and optional water sampling and monitoring. The contract is unit price based and includes all labor, equipment, permits, and quality assurance.

Deliverables

  • geotechnical investigation reports
  • soil and water samples (if applicable)
  • survey point measurements and documentation
  • coordination with landowners
  • quality assurance documentation

Required services

  • geotechnical engineering
  • surveying and measurement
  • environmental monitoring (optional)
  • reporting and documentation

Pelenoir assessment

This project focuses on geotechnical investigations and surveying for the planning phase of a highway infrastructure project. The primary scope involves surveying and geomatics activities, such as soil sampling and measurement, while engineering and technical planning supports the analysis and reporting of geotechnical data.

  • Surveying 60%

    Execution of geotechnical surveying, soil sampling, survey point measurements, and geodata collection for the planning phase of Highway 4.

  • Technical planning and engineering analysis of geotechnical data, including soil and water sample analysis, reporting, and coordination with infrastructure planning requirements.

How to take part

Who can apply

  • compliance with Finnish procurement law exclusion grounds
  • valid rikosrekisteriote (criminal record extract) required before contract signing

What to submit

  • tender documents as specified in the procurement documents
  • unit price-based offer

Award criteria

  • lowest price (Halvin hinta)

Source

Published on HILMA. Original title: Vt 4 Rovaniemi-Apukka, TS -vaiheen pohjatutkimukset.

Summary and assessment prepared by Pelenoir from the public notice (23 Oct 2026). The original notice and its documents are binding. Page updated 23 Oct 2026.