Engineering · Service contract
Roundabout at Chrościckiego and Świerszcza Streets
Preparation of design documentation and provision of authorial supervision for the construction of a roundabout at the intersection of Chrościckiego and Świerszcza Streets in Warsaw.
- Deadline
- Closed 51 days ago
- Location
- Warszawa, mazowieckie, Poland
About the project
Preparation of design documentation and provision of authorial supervision for the construction of a roundabout at the intersection of Chrościckiego and Świerszcza Streets in Warsaw.
Scope of work
Preparation of design documentation and authorial supervision for the construction of a roundabout, including required professional qualifications, experience, and submission of financial and technical documentation.
Deliverables
- design documentation for the roundabout construction
- authorial supervision during project implementation
Required services
- engineering design services (road infrastructure)
- authorial supervision
Pelenoir assessment
The project primarily involves engineering and technical planning for the design of a roundabout, including detailed documentation and technical specifications. A secondary component is authorial supervision during construction to ensure design compliance. The scope does not support architectural design, urban planning, or other AEC disciplines beyond engineering and construction oversight.
-
Engineering 80%
Design and technical planning for the roundabout, including road geometry, drainage, signage, lighting, and integration with existing urban infrastructure. Preparation of detailed engineering documentation required for construction.
-
Authorial supervision during the construction phase to ensure compliance with the design documentation and address any technical issues arising during implementation.
How to take part
Who can apply
- annual revenue of at least 160,000 PLN for the last three fiscal years
- civil liability insurance of at least 80,000 PLN
- experience in delivering design documentation for road construction or reconstruction in a city with over 100,000 inhabitants (minimum two projects, each worth at least 100,000 PLN)
- availability of qualified personnel with required professional licenses (road, electrical, thermal, and telecommunication engineering)
What to submit
- financial statements for the last three fiscal years
- proof of civil liability insurance
- list of completed projects (with references)
- list of personnel with qualifications and experience
Award criteria
- Price (60%)
- Completion time (40%)
Source
Published on e-Zamowienia. Original title: Przygotowanie dokumentacji projektowej wraz z pełnieniem nadzoru autorskiego dla zadania inwestycyjnego pn.: „Budowa ronda na skrzyżowaniu ul. Chrościckiego i Świerszcza”.
Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 1 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.