About the project

Thermal renovation of the externat building at Rouget de Lisle College to improve energy performance, targeting a 60% reduction in energy consumption by 2050 as required by the tertiary decree.

Scope of work

Full project management (maîtrise d'oeuvre) for thermal renovation of the externat building at Rouget de Lisle College, including design, coordination, and supervision to achieve a 60% reduction in energy consumption.

Deliverables

  • Thermal renovation design and execution plans
  • Energy performance improvement documentation

Required services

  • Project management (maîtrise d'oeuvre)
  • Design and coordination of thermal renovation works

Pelenoir assessment

This project focuses on the thermal renovation of an educational building to improve energy efficiency, primarily involving architectural design and engineering for building upgrades. Sustainability and building performance are secondary but critical components to meet regulatory targets.

  • Architectural design and coordination for the thermal renovation of the externat building, including integration of energy-efficient solutions and compliance with the tertiary decree requirements.

  • Structural and building-services engineering to support the thermal renovation, including energy performance improvements and technical planning for systems upgrades.

  • Energy performance optimization, sustainability certification, and compliance with the tertiary decree's energy reduction targets.

How to take part

Who can apply

  • Compliance with French public procurement code (Code de la commande publique) exclusion grounds
  • Demonstrated economic, financial, technical, and professional capacity

What to submit

  • Digital submission via www.xmarches.fr
  • Documents justifying economic and financial capacity
  • Documents justifying technical and professional capacity

Award criteria

  • Refer to the consultation regulations (règlement de la consultation)

Source

Published on BOAMP. Original title: Rénovation thermique du collège Rouget de Lisle - Bâtiment externat - Mission de maîtrise d'oeuvre-..

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 13 Sep 2026.