About the project

Preparation of design documentation for three road infrastructure projects under the Civil Defence and Population Protection Programme in Bydgoszcz: (1) additional technical service point for University Hospital No. 23, (2) extension of Słowiańska Street, and (3) reconstruction of Powstania Listopadowego Street. The projects include multi-stage design work, potential optional stages, and administrative approvals for construction.

Scope of work

Preparation of design documentation for three road infrastructure projects, including conceptual, construction, and execution designs, administrative approvals, and optional additional stages. The projects involve road extensions, reconstruction, and a technical service point for a hospital, with multi-stage delivery and potential optional work packages.

Deliverables

  • Design documentation for construction, reconstruction, or extension of public roads
  • Administrative decisions allowing commencement of construction
  • Multi-stage design work (Etap 1a, 1b, 2, 3, 5) with optional stages (Etap 4, 6)
  • Projected contract terms and conditions (Załącznik Nr 1 do SWZ)
  • Offer forms for each part (Załącznik Nr 2 - I-III do SWZ)

Required services

  • Engineering design services for roads
  • Preparation of construction documentation
  • Administrative approval processes

Pelenoir assessment

The project primarily involves engineering and technical planning for road infrastructure, including design documentation for road extensions, reconstruction, and a technical service point. A secondary component includes project and construction management to coordinate multi-stage design work and administrative approvals.

  • Preparation of conceptual, construction, and execution designs for road infrastructure, including structural and technical engineering for road extensions, reconstruction, and a technical service point for a hospital. This includes civil engineering, road design, and technical planning to meet functional-technical class 'D' or higher standards.

  • Coordination of multi-stage design work, administrative approval processes, and potential optional stages (e.g., Etap 4 and 6) to ensure compliance with project timelines and regulatory requirements.

How to take part

Who can apply

  • Experience in preparing design documentation for public roads of functional-technical class 'D' or higher, minimum 100 m in length, completed within the last 3 years
  • At least one designer with road engineering qualifications and 3 years of experience, including one completed road design project
  • For Part 3: Designer must have completed training in classified information protection and hold a valid certificate
  • Consortium members may pool qualifications, but at least one member must meet the full requirements

What to submit

  • Electronic offer form (Załącznik Nr 2 - I-III do SWZ)
  • Statements confirming eligibility and absence of exclusion grounds (Załącznik Nr 9 i 10 do SWZ)
  • Documentation of experience and qualifications (Załącznik Nr 7 i 8 do SWZ)
  • Bid bond for each part (Część 1: 3,500 PLN, Część 2: 1,500 PLN, Część 3: 500 PLN)
  • Electronic signatures (qualified, trusted, or personal) on all documents

Award criteria

  • Price (60% weight)
  • Additional experience of the designer in road engineering (40% weight)

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowych dla realizacji zadań w ramach Programu Ochrony Ludności i Obrony Cywilnej w Bydgoszczy.

Summary and assessment prepared by Pelenoir from the public notice (13 Nov 2026). The original notice and its documents are binding. Page updated 12 Nov 2026.