About the project

Planning, execution preparation, and project management for residential development at Braunhirschengasse 12-20 and Grimmgasse 11-13 in Vienna, including general planning services under an open procurement procedure.

Scope of work

General planning services for residential development, including execution preparation and project management. The procedure follows the lowest bidder principle (Billigstbieterprinzip) without a jury or evaluation commission.

Deliverables

  • planning documents
  • execution preparation documents
  • project management documentation

Required services

  • general planning
  • execution preparation
  • project management

Pelenoir assessment

This project primarily involves architectural design and planning for a residential development, supported by project management and technical engineering services. The scope is centered on delivering general planning services, with a clear emphasis on architectural work, while project management and engineering play secondary but essential roles.

  • Architectural design and planning for the residential development at Braunhirschengasse and Grimmgasse, including conceptual and detailed design of buildings and urban integration.

  • Project management, execution preparation, and coordination of the residential development, ensuring compliance with municipal requirements and timelines.

  • Technical planning, including structural and building services engineering, to support the architectural design and ensure compliance with regulatory standards.

How to take part

What to submit

  • documents as specified in the tender materials

Award criteria

  • lowest bid (Billigstbieterprinzip)

Tender documents

The visible document is labeled as 'EU-Bekanntmachung' (EU announcement) with a declared size of 140.35 KB. It likely contains the official procurement notice, procedural details, and legal requirements for the open procedure. The file may include site plans or drawings referenced in the tender context, but their exact content cannot be confirmed without access. No other files or packages are visibly listed, and the content of any additional materials remains unknown.

Source

Published on Architekturwettbewerb.at. Original title: 15., Braunhirschengasse 12-20 und Grimmgasse 11-13 - Planung, Ausführungsvorbereitung und Projektmanagement; bitte beachten Sie den Kommentar der Kammer (A&IK).

Summary and assessment prepared by Pelenoir from the public notice (2 Oct 2026). The original notice and its documents are binding. Page updated 24 Nov 2026.