About the project

Investor supervision services for the renovation of a historic building with a service section at 1-go Maja 50, including local apartment renovations, as part of the second phase of the 'Houses Full of History' revitalization program in Żyrardów.

Scope of work

Investor supervision services for the renovation of a historic building at 1-go Maja 50, including coordination of construction works, compliance with project documentation, and supervision of local apartment renovations. The supervision must cover structural, electrical, and sanitary installations, with special attention to heritage protection requirements.

Deliverables

  • Investor supervision services as defined in the project documentation and contract draft (Załącznik nr 5 do SWZ)

Required services

  • Construction supervision (structural, electrical, sanitary)
  • Coordination of renovation works
  • Compliance verification with project documentation and heritage protection requirements

Pelenoir assessment

The project scope is explicitly limited to investor supervision services for the renovation of a historic building, covering coordination, compliance verification, and oversight of construction works. No architectural design, engineering, or other AEC disciplines are included in the tender's stated requirements.

  • Investor supervision services, including coordination of renovation works, compliance verification with project documentation, and oversight of structural, electrical, and sanitary installations, with special attention to heritage protection requirements.

How to take part

Who can apply

  • Contractor must demonstrate experience in supervising or managing the renovation of at least one historic building
  • Supervision team must include qualified inspectors with valid Polish construction licenses in structural, electrical, and sanitary specialties
  • At least one inspector must meet heritage protection requirements (18 months of experience in heritage building works)
  • Contractor must submit a completed offer form (Załącznik nr 1 do SWZ) and required declarations (Załączniki nr 2, 3, 4, 6)

What to submit

  • Completed offer form (Załącznik nr 1 do SWZ)
  • Declarations of non-exclusion and compliance with participation conditions (Załączniki nr 2, 3)
  • List of personnel assigned to the contract (Załącznik nr 6)
  • Power of attorney (if applicable)
  • Consortium agreement (if applicable)

Award criteria

  • Price – 60% (lowest bid receives maximum points)
  • Experience of the Construction Supervision Inspector (Coordinator) in structural-construction specialty – 40% (0 points for 1 project, 20 for 2, 40 for 3 or more)

Source

Published on e-Zamowienia. Original title: Pełnienie nadzoru inwestorskiego nad przeprowadzeniem remontu budynku przy ul. 1-go Maja 50 w ramach projektu „Domy pełne historii-etap II.".

Summary and assessment prepared by Pelenoir from the public notice (10 Oct 2026). The original notice and its documents are binding. Page updated 9 Oct 2026.