Engineering · Service contract
Rénovation or replacement of pedestrian bridge on Boulevard du 8 Mai 1945
Design and project management for the complete renovation or replacement of an existing pedestrian bridge located on Boulevard du 8 Mai 1945 in Laval, France.
- Deadline
- Closed 19 days ago
- Location
- Laval, Pays de la Loire, France
About the project
Design and project management for the complete renovation or replacement of an existing pedestrian bridge located on Boulevard du 8 Mai 1945 in Laval, France.
Scope of work
Project management (maîtrise d'œuvre) services for the complete renovation or replacement of a pedestrian bridge, including mandatory site visit, technical and environmental evaluation criteria, and submission of a methodological note.
Deliverables
- Project management services for bridge renovation or replacement
Required services
- Project management (maîtrise d'œuvre)
- Technical and environmental methodology
Pelenoir assessment
This project primarily involves the technical and structural engineering required for the renovation or replacement of a pedestrian bridge, supported by project management services for coordination and oversight. The scope is focused on civil infrastructure and does not include architectural design, urban planning, or interior elements.
-
Engineering 70%
Structural and technical design for the renovation or replacement of the pedestrian bridge, including load-bearing calculations, material specifications, and compliance with civil engineering standards.
-
Project management (maîtrise d'œuvre) services, including coordination of technical teams, cost and schedule oversight, and supervision of the renovation or replacement process.
How to take part
Who can apply
- Mandatory site visit before submission of offers
- Compliance with technical, financial, and professional capacity requirements (see tender documents)
What to submit
- Methodological note addressing technical and environmental criteria
Award criteria
- Price of services (40% weighting)
- Technical quality of the offer (45% weighting)
- Environmental quality of the offer (15% weighting)
Source
Published on BOAMP. Original title: Mission de maîtrise d'œuvre pour la rénovation complète ou le remplacement de la passerelle piétonne du boulevard du 8 Mai 1945.
Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 9 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

