About the project

Design and project management for the complete renovation or replacement of an existing pedestrian bridge located on Boulevard du 8 Mai 1945 in Laval, France.

Scope of work

Project management (maîtrise d'œuvre) services for the complete renovation or replacement of a pedestrian bridge, including mandatory site visit, technical and environmental evaluation criteria, and submission of a methodological note.

Deliverables

  • Project management services for bridge renovation or replacement

Required services

  • Project management (maîtrise d'œuvre)
  • Technical and environmental methodology

Pelenoir assessment

This project primarily involves the technical and structural engineering required for the renovation or replacement of a pedestrian bridge, supported by project management services for coordination and oversight. The scope is focused on civil infrastructure and does not include architectural design, urban planning, or interior elements.

  • Structural and technical design for the renovation or replacement of the pedestrian bridge, including load-bearing calculations, material specifications, and compliance with civil engineering standards.

  • Project management (maîtrise d'œuvre) services, including coordination of technical teams, cost and schedule oversight, and supervision of the renovation or replacement process.

How to take part

Who can apply

  • Mandatory site visit before submission of offers
  • Compliance with technical, financial, and professional capacity requirements (see tender documents)

What to submit

  • Methodological note addressing technical and environmental criteria

Award criteria

  • Price of services (40% weighting)
  • Technical quality of the offer (45% weighting)
  • Environmental quality of the offer (15% weighting)

Source

Published on BOAMP. Original title: Mission de maîtrise d'œuvre pour la rénovation complète ou le remplacement de la passerelle piétonne du boulevard du 8 Mai 1945.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 9 Oct 2026.