About the project

Renovation and remodeling of the Teatr Polski building in Poznań, including the construction of an external elevator. The project involves multi-disciplinary authorial supervision, cost estimation updates, and support for selecting a contractor for construction works. The building is under conservatory protection.

Scope of work

The contract covers multi-disciplinary authorial supervision for the renovation and remodeling of Teatr Polski in Poznań, including an external elevator. The scope includes two stages: Stage I (basic) involves reviewing documentation, updating cost estimates, and supporting the selection of a construction contractor; Stage II (optional) involves authorial supervision during construction works, including coordination of architectural, structural, sanitary, electrical, telecommunications, and road solutions, as well as collaboration with acoustic designers. The contract excludes specialist acoustic services and investor supervision.

Deliverables

  • initial report on documentation review
  • updated investor cost estimates (maximum two updates)
  • collective cost summary
  • support for preparation and conduct of construction works procurement
  • multi-disciplinary authorial supervision during construction (optional Stage II)
  • coordination of alternative solutions, clarifications, and participation in meetings and inspections

Required services

  • architectural supervision
  • structural supervision
  • sanitary installations supervision
  • electrical installations supervision
  • telecommunications installations supervision
  • road engineering supervision
  • stage technology supervision

Pelenoir assessment

The project involves multi-disciplinary authorial supervision for the renovation and expansion of a culturally protected theatre building. The primary focus is on architectural design compliance and coordination, with secondary roles for technical engineering supervision and project management support during procurement and construction.

  • Architectural concept oversight, design compliance, and coordination of architectural solutions for the renovation and expansion of Teatr Polski, including conservatory protection requirements.

  • Structural, sanitary, electrical, telecommunications, and road engineering supervision, including coordination of technical solutions and updates to cost estimates.

  • Support for contractor selection, cost estimation updates, and coordination of construction works during the optional Stage II, including participation in meetings and inspections.

How to take part

Who can apply

  • Contractors must demonstrate availability of qualified personnel for specified roles, including a coordinator with unrestricted architectural design rights, designers with relevant construction licenses, and a stage technology specialist with experience in theatre projects.
  • Contractors may jointly meet eligibility requirements or use resources of other entities.
  • Foreign contractors must comply with Polish regulations for performing professional activities.
  • Participation in a site inspection is mandatory for submitting an offer.

What to submit

  • Offer form including price and coordinator experience (Annex 1 to SWZ)
  • Statement on non-exclusion and compliance with participation conditions (Annex 2 to SWZ)
  • Joint bid statement (if applicable, Annex 3 to SWZ)
  • Commitment of resource-providing entities (if applicable, Annex 4 to SWZ)
  • Power of attorney (if applicable)
  • Confidentiality statements (if applicable)
  • Documents in Polish or with Polish translation

Award criteria

  • Combined gross price for basic scope and full option (60 points)
  • Experience of the supervision coordinator (40 points)

Source

Published on e-Zamowienia. Original title: Pełnienie wielobranżowego nadzoru autorskiego wraz ze wsparciem wyboru wykonawcy robót budowlanych dla przebudowy i remontu budynku Teatru Polskiego w Poznaniu oraz rozbudowy o windę zewnętrzną.

Summary and assessment prepared by Pelenoir from the public notice (5 Nov 2026). The original notice and its documents are binding. Page updated 5 Nov 2026.