Engineering · Service contract
Rehabilitation of the East Mole Quay in Büsum Harbour
Rehabilitation of the existing quay structure at the East Mole in Büsum Harbour to restore full structural stability for a harbour depth of NHN minus 7.50 m, ensure functional capability of the quay, and enable full use for cargo handling.
- Deadline
- Closed 12 days ago
- Location
- Büsum, Schleswig-Holstein, Germany
About the project
Rehabilitation of the existing quay structure at the East Mole in Büsum Harbour to restore full structural stability for a harbour depth of NHN minus 7.50 m, ensure functional capability of the quay, and enable full use for cargo handling. The project includes engineering services for object planning and structural planning according to HOAI phases 2, 3, 5, and 6.
Scope of work
Engineering services for the rehabilitation of the East Mole quay in Büsum Harbour, including object planning and structural planning according to HOAI phases 2, 3, 5, and 6. The services are divided into three performance stages: preliminary design (phase 2), design planning (phase 3), and execution planning with preparation for award (phases 5 and 6). Structural planning also includes approval planning (phase 4).
Deliverables
- Preliminary design (Vorplanung, HOAI phase 2)
- Design planning (Entwurfsplanung, HOAI phase 3)
- Execution planning and preparation for award (Ausführungsplanung und Vorbereitung der Vergabe, HOAI phases 5 and 6)
- Structural planning including approval planning (Genehmigungsplanung, HOAI phase 4)
Required services
- Object planning for engineering structures (Objektplanung für Ingenieurbauwerke)
- Structural planning (Tragwerksplanung)
Pelenoir assessment
This project is classified under ENGINEERING_AND_TECHNICAL_PLANNING as its scope is exclusively focused on the technical and structural rehabilitation of a quay structure, requiring detailed engineering services for object and structural planning.
-
Engineering 100%
Structural and object planning for the rehabilitation of the East Mole quay, including preliminary design, design planning, execution planning, and approval planning to ensure structural stability and functional capability of the quay infrastructure.
How to take part
What to submit
- Electronic offers without electronic signature (Textform)
Award criteria
- Honorar (fee)
- Project-specific experience of the responsible person for object planning
- Project-specific experience of the responsible person for structural planning
- Schedule concept (Terminkonzept)
Source
Published on eVergabe Online. Original title: Ingenieurleistungen Grundinstandsetzung der Kaje an der Ostmole im Hafen Büsum.
Summary and assessment prepared by Pelenoir from the public notice (15 Oct 2026). The original notice and its documents are binding. Page updated 14 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.

