Tenders of Europe project card: Regional high-bay warehouse for civil protection and defence in Bydgoszcz, Bydgoszcz, Poland
Featured in the daily edition, 7 Oct 2026

About the project

Preparation of execution design documentation for a regional high-bay warehouse for civil protection and defence purposes, including associated infrastructure, and obtaining a building permit. The scope includes conceptual design, construction permit documentation, author supervision, support for the client in procuring construction works, and promotional materials.

Why it matters

A high-bay warehouse demands a designer who thinks logistics. The brief asks for execution design, not just a concept—precision matters.

Scope of work

Preparation of execution design documentation for a high-bay warehouse, including conceptual design, construction permit documentation, author supervision, support for procurement of construction works, and promotional materials.

Deliverables

  • conceptual design for the investment
  • execution design documentation required for obtaining a building permit
  • building permit
  • author supervision during construction
  • support for the client in procuring construction works
  • promotional materials

Required services

Pelenoir assessment

The project primarily involves architectural and design work for a regional high-bay warehouse, including conceptual design, construction permit documentation, and author supervision. Engineering and technical planning for structural, sanitary, and electrical systems, as well as landscape design for outdoor infrastructure, are also explicitly supported by the scope. Project and construction management services are required to assist the client in procurement and ensure compliance during construction.

  • Architectural concept and building design for the high-bay warehouse, including spatial organization, functional layout, and compliance with civil protection and defence requirements. Preparation of construction permit documentation and author supervision during construction.

  • Structural design for the high-bay warehouse, including load-bearing systems, foundation design, and technical specifications. Design of sanitary and electrical installations to support warehouse operations and safety requirements.

  • Design of outdoor spaces, access roads, parking, and landscaping elements around the high-bay warehouse to integrate the facility with its surroundings and ensure functional outdoor infrastructure.

  • Support for the client in procuring construction works, including tender preparation, contractor selection, and coordination during the construction phase. Author supervision to ensure compliance with design intent and regulatory requirements.

How to take part

Who can apply

  • valid civil liability insurance of at least 500,000 PLN for activities related to the contract
  • legal capacity to operate in the market
  • required professional qualifications and licenses
  • experience in preparing execution design documentation for buildings with a volume of at least 30,000 m³, including garage, warehouse, or office functions, within the last 3 years
  • designated personnel with professional qualifications and experience for roles such as architect, structural designer, and sanitary/electrical installations designer

What to submit

  • offer prepared in Polish
  • documents must be submitted electronically via the e-propublico.pl platform
  • qualified electronic signature (PAdES for PDF/XML, XAdES for other formats) or trusted signature required
  • insurance policy for civil liability
  • statements confirming eligibility and absence of exclusion grounds
  • list of completed design documentation with building permits
  • list of personnel assigned to the project with their qualifications

Award criteria

  • Price (60% weight)
  • Experience of personnel assigned to the project (40% weight)

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowo-wykonawczej pn.: „Budowa wojewódzkiego magazynu wysokiego składu na potrzeby OLiOC wraz z infrastrukturą towarzyszącą przy ulicy Ernsta Petersona w Bydgoszczy”.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 7 Oct 2026.