About the project

Comprehensive design and cost documentation for the reconstruction of the municipal stadium pitch at ul. Mokronoskich 4, including pitch heating and drainage systems.

Scope of work

Development of comprehensive design and cost documentation for the reconstruction of the municipal stadium pitch, including heating and drainage systems. The scope includes site surveys, soil and water condition studies, design documentation, obtaining necessary permits, and author supervision.

Deliverables

  • Functional-technical concept
  • Complete design documentation
  • Required approvals, opinions, decisions, and permits
  • Execution project
  • Technical specifications for construction and acceptance
  • Bill of quantities
  • Investor cost estimates
  • Work schedule accounting for grass growth and rooting
  • Operation and maintenance instructions
  • Author supervision

Required services

Pelenoir assessment

The project primarily involves the redesign of a municipal stadium pitch, with a strong focus on architectural and engineering design for the reconstruction, including pitch heating and drainage systems. Engineering tasks dominate the scope, followed by architectural design and project supervision.

  • Structural, road, electrical, and sanitary engineering design for the pitch reconstruction, including pitch heating, drainage systems, and technical specifications for construction and acceptance.

  • Architectural design of the stadium pitch reconstruction, including functional-technical concept, design documentation, and integration of pitch heating and drainage systems within the overall site layout.

  • Author supervision during the implementation phase, ensuring compliance with design documentation and obtaining necessary permits and approvals.

How to take part

Who can apply

  • Execution of at least one design documentation for a full-size football pitch with heated turf in the last five years
  • Availability of qualified personnel with unlimited design licenses in architectural, structural, road, electrical, and sanitary specialties
  • Demonstrated experience of electrical and sanitary designers in relevant project documentation

What to submit

  • Offer form (Załącznik nr 1 do SWZ)
  • Statutory declarations (Rozdział X ust. 1 SWZ)
  • Subcontractor commitment (if applicable, Załącznik nr 7 do SWZ)
  • Power of attorney for joint bidders or individual representation (if applicable)
  • List of completed services with references (Załącznik nr 3 do SWZ)
  • List of personnel with qualifications and experience (Załącznik nr 4 do SWZ)

Award criteria

  • Price (60%)
  • Experience of sanitary designer (20%)
  • Experience of electrical designer (20%)

Source

Published on e-Zamowienia. Original title: „Opracowanie kompleksowej dokumentacji projektowo-kosztorysowej przebudowy płyty boiska stadionu miejskiego przy ul. Mokronoskich 4 wraz z podgrzewaniem murawy i odwodnieniem"..

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 8 Oct 2026.