Engineering · Service contract
Redesign of DW 705 and Smolna Street intersection in Sochaczew
Preparation of design documentation for the expansion of the intersection of provincial road DW 705 with Smolna Street in Sochaczew, including geotechnical and geological documentation, construction design, demolition project, land division maps…
- Deadline
- Closed 44 days ago
- Location
- Sochaczew, Mazowieckie, Poland
About the project
Preparation of design documentation for the expansion of the intersection of provincial road DW 705 with Smolna Street in Sochaczew, including geotechnical and geological documentation, construction design, demolition project, land division maps, applications for road investment permits and water law consents, traffic organization plan, execution project, technical specifications, and cost estimates.
Scope of work
Preparation of comprehensive design documentation for the expansion of the DW 705 and Smolna Street intersection, including geotechnical studies, construction and demolition designs, land division maps, permit applications, traffic organization, execution project, technical specifications, and cost estimates. The documentation must comply with Polish construction law and allow for equivalent technical solutions.
Deliverables
- Geotechnical and geological documentation
- Construction design (PZT, PAB, and PT)
- Demolition project
- Land division maps
- Attachments for road investment permit application
- Attachments for water law consent application
- Permanent traffic organization project
- Execution project
- Technical specifications
- Investor's cost estimate
Required services
- Architectural design services
- Geotechnical studies
- Traffic organization planning
- Cost estimation
Pelenoir assessment
This project primarily involves engineering and technical planning for the expansion of a road intersection, with secondary components of urban design and planning, as well as surveying and geomatics. The scope is focused on delivering comprehensive design documentation for civil and transport infrastructure, including geotechnical studies, construction design, traffic organization, and permit applications.
-
Engineering 70%
Structural, civil, and technical engineering for the expansion of the DW 705 and Smolna Street intersection, including geotechnical studies, construction design, traffic organization, and technical specifications for road infrastructure.
-
Urban and spatial planning for the intersection redesign, including traffic organization, land division maps, and integration of the intersection into the existing urban fabric.
-
Surveying 10%
Surveying and geodetic services, including land division maps and geotechnical surveying for the intersection expansion.
How to take part
Who can apply
- Execution of at least 2 design documentation projects for the expansion or construction of a minimum class G road, each at least 0.2 km long, within the last 5 years
- Employment of at least 1 designer and 1 verifying designer with road specialty qualifications under Polish construction law
- Designers must demonstrate experience in at least 2 road construction or expansion projects of minimum class G and 0.2 km length each
What to submit
- Offers must be submitted electronically in formats such as .pdf, .doc, .docx, .xls, .xlsx, or .jpg, with a preference for .pdf
- Offers must be signed with a trusted or personal signature
- Submission via the electronic procurement platform (platformazakupowa.pl)
- Documents must be in Polish
Award criteria
- Price (60% weight)
- Warranty period (40% weight)
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej na rozbudowę skrzyżowania DW 705 z ul. Smolną w m. Sochaczew – nr postępowania 192/26.
Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 5 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.