Architecture · Service contract
Rebuild of the 70th Anniversary of Independence Municipal Stadium in Dębica
Preparation of design and cost documentation, obtaining administrative decisions, and providing authorial supervision for the rebuild of the existing municipal stadium to meet licensing requirements for second-division football clubs.
- Deadline
- Closed 46 days ago
- Location
- Dębica, Podkarpackie, Poland
About the project
Preparation of design and cost documentation, obtaining administrative decisions, and providing authorial supervision for the rebuild of the existing municipal stadium to meet licensing requirements for second-division football clubs. The project includes architectural, technical, and execution designs, cost estimates, construction permits, and authorial supervision during construction and warranty periods.
Scope of work
Preparation of design and cost documentation for the rebuild of the municipal stadium, including architectural, technical, and execution designs, cost estimates, construction permits, and authorial supervision. The project must ensure accessibility for disabled persons and universal design standards.
Deliverables
- Site development project (5 copies, including 2 scanned and sealed copies)
- Architectural and construction design (5 copies, including 2 scanned and sealed copies)
- Multi-discipline technical design (5 copies)
- Multi-discipline execution designs (5 copies)
- Bill of quantities (2 copies with SSTWiORB and CPV references)
- Investor cost estimates for all disciplines (2 copies)
- Technical Specifications for Execution and Acceptance of Works (STWiORB, 2 copies)
- Equipment specifications (2 copies)
- Visualizations (4 external and 4 internal copies)
- Obtaining a construction permit and all required administrative decisions
- Authorial supervision during construction and warranty periods
- Other formal and legal activities (e.g., geotechnical studies, environmental decisions, utility conditions)
Required services
- Architectural design
- Structural engineering design
- Mechanical, electrical, and plumbing (MEP) design
- Cost estimation and budgeting
- Authorial supervision
- Obtaining administrative permits and decisions
Pelenoir assessment
The project primarily involves the rebuild of a municipal stadium, with a strong focus on architectural design and execution documentation. Engineering and technical planning, including structural and MEP design, is a significant secondary component. Project and construction management services, such as authorial supervision and permit acquisition, are also required to support the project's delivery.
-
Architecture 50%
Architectural concept, building design, and execution documentation for the rebuild of the municipal stadium, including compliance with licensing requirements for second-division football clubs and universal design standards.
-
Engineering 30%
Structural engineering, MEP (mechanical, electrical, and plumbing) design, technical specifications, and execution designs for the stadium rebuild, including reinforced concrete stands and multi-discipline coordination.
-
Authorial supervision during construction and warranty periods, obtaining administrative permits and decisions, and ensuring compliance with project requirements and timelines.
How to take part
Who can apply
- Experience in designing football stadiums meeting second-division league requirements with reinforced concrete stands (minimum 300 seats, 200 covered)
- Experience in designing multi-purpose sports buildings (minimum 400 m² usable area)
- Qualified personnel with architectural, structural, and MEP design licenses
- Minimum 5 years of professional experience for key personnel
What to submit
- Offer form (Załącznik nr 1)
- Exclusion statements (Załącznik nr 2 and 2a if applicable)
- Compliance statements (Załącznik nr 3 and 3a if applicable)
- Consortium agreement (if applicable, Załącznik nr 4)
- Resource-sharing statements (Załącznik nr 5 if applicable)
- Power of attorney (if applicable, original or notarized copy)
- Electronic signatures (qualified, trusted, or personal)
- Preferred file formats: PDF, DOC, XLS, RTF (PDF recommended)
Award criteria
- Price (60% weight)
- Experience of the architect (20% weight)
- Experience of the structural engineer (20% weight)
Source
Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowo-kosztorysowej dla zadania: „Przebudowa stadionu miejskiego 70-lecia Odzyskania Niepodległości przy ul. Sportowej”.
Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 24 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
