Engineering · Service contract
Rebuild and expansion of two culverts with a section of municipal road on Popka Street
Preparation of complete design and cost documentation for the rebuild and expansion of two culverts and a section of municipal road, including necessary infrastructure such as road widening, pedestrian paths, stormwater drainage, retaining walls, and utility…
- Deadline
- Closed 40 days ago
- Location
- Bochnia, Małopolskie, Poland
About the project
Preparation of complete design and cost documentation for the rebuild and expansion of two culverts and a section of municipal road, including necessary infrastructure such as road widening, pedestrian paths, stormwater drainage, retaining walls, and utility relocations. The project also includes obtaining all required permits, approvals, and decisions (including environmental and construction permits), as well as author supervision during construction.
Scope of work
Preparation of design and cost documentation for the rebuild and expansion of two culverts and a section of municipal road, including architectural, technical, and execution designs, environmental and geotechnical studies, permits, and author supervision. The project is divided into three stages: concept design (30% of contract value), construction and architectural design (40%), and technical/execution design with final permits (30%).
Deliverables
- Multidisciplinary construction design (site development, architectural, technical)
- Project-purpose map with required updates and approvals
- Complete formal and legal documents
- Approved traffic organization project
- Investment cost estimate and bill of quantities
- Technical specifications for execution and acceptance of works
- Greenery design including tree felling plan
- Geological and geotechnical documentation
- Complete documentation in PDF and editable formats (Word, DWG, ATH, Excel) on a data carrier
- Designer's statement on the identity of paper and electronic documentation
Required services
- Architectural design services
- Engineering design services
- Environmental impact assessment
- Geotechnical studies
- Obtaining permits and approvals (including ZRID decision)
- Author supervision during construction
Pelenoir assessment
This project is primarily a civil and infrastructure engineering endeavor focused on the rebuild and expansion of two culverts and a municipal road section. The scope includes significant technical planning (e.g., structural, drainage, utility relocations) alongside architectural design for site development and pedestrian paths. Project management tasks, such as permit acquisition and author supervision, are also required but represent a smaller share of the scope.
-
Engineering 70%
Structural, civil, and technical engineering design for the rebuild and expansion of two culverts and a section of municipal road, including stormwater drainage, retaining walls, utility relocations, and geotechnical documentation.
-
Architecture 20%
Architectural design for the municipal road section, including site development, pedestrian paths, and integration of infrastructure elements (e.g., retaining walls, greenery design).
-
Obtaining all required permits (including ZRID decision), approvals, and author supervision during construction to ensure compliance with legal and technical requirements.
How to take part
Who can apply
- Contractors must not be subject to exclusion under art. 108 ust. 1 and art. 109 ust. 1 pkt 4, 5, 7 of the Polish Public Procurement Law
- Contractors must meet the conditions for participation specified by the contracting authority
- Foreign contractors must provide equivalent documents from their country of origin
What to submit
- Completed and signed offer form (Annex No. 1)
- Statement on non-exclusion from the procedure (Annex No. 2)
- Statement from jointly applying contractors on the division of works (if applicable)
- Commitment from other entities providing resources (if applicable)
- Statement from the entity providing resources on non-exclusion and meeting conditions (if applicable)
- Proof of equivalence for offered materials (if applicable)
- Confidentiality annex (if applicable)
- Power of attorney for representatives (if applicable)
Award criteria
- Price (60% weight)
- Experience of persons designated for the contract (40% weight)
Tender documents
The visible document package includes a mix of PDF, DOC, and ZIP files. The PDFs likely contain the tender specifications (SWZ), draft contract terms, and a project orientation map. The ZIP files appear to include graphic attachments (e.g., preliminary designs or sketches of the culverts and road section), site photos, and additional annexes or supporting documents. The DOC file is probably the official offer form required for submission. The exact contents of the ZIP archives cannot be confirmed without access, but their names suggest they contain visual and technical materials supporting the tender.
Source
Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowo – kosztorysowej przebudowy i rozbudowy dwóch przepustów wraz z odcinkiem drogi gminnej w ul. Popka.
Summary and assessment prepared by Pelenoir from the public notice (10 Oct 2026). The original notice and its documents are binding. Page updated 9 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.