About the project

Design of detailed project documentation (DGD/PZI) for the extension of railway tracks in the VI group at the Port of Koper.

Scope of work

Preparation of detailed project documentation (DGD/PZI) for the extension of railway tracks in the VI group at the Port of Koper. The contract includes design services, submission of project documentation, and compliance with public procurement criteria.

Deliverables

  • Detailed project documentation (DGD/PZI)

Required services

Pelenoir assessment

The project primarily involves engineering and technical planning for the extension of railway tracks at a port, with a secondary focus on architectural design for any associated built structures. The scope is dominated by infrastructure engineering, supported by limited architectural input.

  • Design of structural and technical elements for the extension of railway tracks, including track alignment, signaling systems, drainage, and integration with existing port infrastructure.

  • Design of ancillary structures such as platforms, shelters, or operational buildings associated with the railway extension, if applicable.

How to take part

Who can apply

  • Open to small and medium-sized enterprises (SMEs)
  • Electronic submission of bids is mandatory

What to submit

  • Tender documentation as specified in the procurement files

Award criteria

  • Price is not the only criterion; see tender documentation for full evaluation method

Tender documents

The visible ZIP file is titled 'rd JN 79-2026_27102026.zip' and is linked directly from the tender page. It likely contains the full tender documentation package, including contractual terms, submission forms, and instructions for bidders. The file may also include technical specifications or annexes related to the railway extension design. However, the exact contents cannot be confirmed without accessing the file, and no size or detailed breakdown is provided in the source.

Source

Published on eNaročanje. Original title: Podaljšanje tirov VI. skupine-izdelava projektne dokumentacije DGD/PZI.

Summary and assessment prepared by Pelenoir from the public notice (18 Nov 2026). The original notice and its documents are binding. Page updated 28 Nov 2026.