About the project

Development of complete multi-disciplinary design and execution documentation for a swimming and sports complex, including obtaining all necessary administrative decisions, approvals, opinions, permits and other documents required for the construction of the facility.

Scope of work

Preparation of complete multi-disciplinary design and execution documentation for a swimming and sports complex, including all necessary administrative decisions, approvals, opinions, permits and other documents required for construction. The contract duration is 8 months.

Deliverables

  • complete multi-disciplinary design and execution documentation
  • administrative decisions, approvals, opinions and permits required for construction

Required services

Pelenoir assessment

The project primarily involves the design of a swimming and sports complex, requiring architectural and engineering services to develop complete multi-disciplinary design and execution documentation. Project management support is also needed to secure administrative approvals and permits, but this represents a smaller share of the scope.

  • Architectural concept and building design for the swimming and sports complex, including spatial organization, functional layout, and aesthetic integration with the existing educational facility.

  • Structural, civil, and building-services engineering for the swimming pool, sports halls, and associated infrastructure, including technical systems such as HVAC, electrical, plumbing, and pool-specific installations.

  • Coordination of the design process, obtaining administrative approvals, permits, and opinions, and ensuring compliance with regulatory requirements for construction.

How to take part

Who can apply

  • execution of at least 2 similar design services for swimming pools or sports complexes in the last 5 years, each worth at least PLN 300,000 gross
  • availability of at least one designer with unlimited architectural or structural-building design qualifications who has prepared at least 2 similar designs

What to submit

  • offers and documents must be submitted in Polish
  • electronic submission via the e-Zamówienia platform
  • use of specified forms and attachments (SWZ and annexes 1–10)

Award criteria

  • Cost (60% weight)
  • Experience of the lead designer (40% weight)

Tender documents

The visible document package includes four files: SWZ.pdf (likely the main tender conditions and specifications), Zał. nr 1-8 do SWZ.doc (a Word document containing annexes 1–8, probably submission forms and templates), Zał.nr 10 do SWZ KONCPECJA.zip (a ZIP archive labeled as a design concept, likely containing drawings, plans or preliminary design materials), and Zał.nr 9 do SWZ.pdf (another PDF annex, possibly additional contract terms or technical requirements). The ZIP archive suggests the presence of design files, but its exact contents remain unknown without download. The PDF and DOC files are expected to contain procedural and administrative details for offer preparation and submission.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej kompleksu basenowo -sportowego dla zadania pn. „Power Hub Kompetencji i Sprawności - Rozwój Zespołu Szkół nr 2 w Koluszkach”.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 29 Sep 2026.