About the project

Preparation of design documentation and revitalization of an existing playground, including equipment replacement, safety surfacing, and compliance with functional and technical requirements outlined in the functional-utility program (PFU).

Scope of work

Design documentation preparation and revitalization of a playground, including replacement of play equipment, safety surfacing, and compliance with functional-utility program (PFU) requirements. Contractor must provide technical datasheets, certificates, and optionally equivalent equipment proposals with functional and technical equivalence proof.

Deliverables

  • design documentation
  • revitalized playground with safety surfacing
  • technical datasheets for play equipment
  • certificates for play equipment (issued by Polish Centre for Accreditation)
  • optional: equivalent equipment proposal with functional and technical equivalence proof

Required services

Pelenoir assessment

This project primarily involves the revitalization of a playground, focusing on landscape architecture for outdoor space design and equipment integration. Secondary disciplines include engineering and technical planning for equipment safety and compliance, as well as project and construction management for supervision and coordination.

  • Design and revitalization of the playground's outdoor environment, including layout, safety surfacing, planting, and integration of play equipment within the public space.

  • Structural and technical engineering for playground equipment, safety compliance, and infrastructure (e.g., foundations, surfacing materials, and technical certification of equipment).

  • Construction supervision, contractor coordination, and ensuring compliance with the functional-utility program (PFU) during the revitalization works.

How to take part

Who can apply

  • Contractor must have completed at least 2 similar playground construction or renovation projects worth minimum 150,000 PLN gross each within the last 5 years
  • Contractor must employ at least 1 person with unlimited architectural design qualifications, 1 person with unlimited construction supervision qualifications (structural-engineering), and 1 construction manager with unlimited structural-engineering qualifications
  • Contractor must possess civil liability insurance with a minimum coverage of 50,000 PLN for the entire contract duration

What to submit

  • technical datasheets for play equipment with valid certificates
  • certificates issued by Polish Centre for Accreditation with manufacturer authorization
  • optional: equivalent equipment proposal with functional and technical equivalence proof (including product visualization, dimensional, material, and technological parameters, component list, and functionality description)
  • site development concept if proposing alternative equipment (proving compliance with project assumptions without increasing playground area or safety surfacing)
  • material datasheets confirming minimum equipment parameters
  • offer valuation for works and proposed equipment (attachment 1A to SWZ)

Award criteria

  • Cost (80% weight)
  • Guarantee (20% weight)

Tender documents

The visible document package includes two ZIP archives and four individual files. The 'Program funkcjonalno-użytkowy.zip' (Functional-Utility Program) likely contains detailed project requirements, technical specifications, and design guidelines for the playground revitalization. The 'Projektowane postanowienia umowy.zip' (Draft Contract Terms) probably includes contractual conditions, annexes, and legal provisions for the works. The PDF and DOCX files labeled 'SWZ' (Specification of Contract Conditions) and 'Załączniki' (Attachments) likely provide editable and non-editable versions of submission forms, procedural instructions, and supporting documentation. The 'Odpowiedź na zapytania' (Response to Queries) PDF likely clarifies or amends earlier tender documents. The exact contents of the ZIP archives remain unknown without download, but their filenames suggest they contain structured sets of contractual and technical documents.

Source

Published on e-Zamowienia. Original title: Opracowanie dokumentacji projektowej wraz z rewitalizacją placu zabaw przy ul. Siedmiogrodzkiej 11 w Warszawie.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 15 Sep 2026.