Sustainability · Service contract
Photovoltaic Power Plant Construction for DRDP Constanta
Design services for energy analysis and feasibility study for the construction of a photovoltaic power plant to supply energy to the Constanta Regional Directorate of Roads and Bridges (DRDP).
- Deadline
- Closed 25 days ago
- Location
- Constanța, Constanța County, Romania
- Declared value
- RON 520 000 (≈ EUR 97 302)
About the project
Design services for energy analysis and feasibility study for the construction of a photovoltaic power plant to supply energy to the Constanta Regional Directorate of Roads and Bridges (DRDP). The project includes an energy audit and a feasibility study comparing at least two technical and economic scenarios for renewable energy systems with a minimum installed capacity of 6MW.
Scope of work
The project requires design services for an energy audit and feasibility study for a photovoltaic power plant. The feasibility study must compare at least two technical and economic scenarios, including energy output estimates, grid integration, costs, risks, environmental impact, and cost-benefit analysis. The contract duration is 12 months, with a 90-day execution period for the deliverables.
Deliverables
- Energy audit report for each site
- Feasibility study with at least two technical and economic scenarios
- Cost-benefit analysis
- Risk assessment and mitigation plan
- Environmental impact assessment
- Cybersecurity integration plan
Required services
- Energy efficiency auditing
- Feasibility study development
- Technical and economic scenario analysis
- Grid integration planning
- Environmental impact assessment
- Cost-benefit analysis
Pelenoir assessment
The project is primarily focused on sustainability and energy performance, involving an energy audit and feasibility study for a photovoltaic power plant. It also includes secondary technical engineering work related to grid integration and infrastructure planning.
-
Sustainability 70%
Energy analysis, feasibility study for renewable energy systems, energy efficiency auditing, and environmental impact assessment for the photovoltaic power plant.
-
Engineering 30%
Technical scenario analysis, grid integration planning, and infrastructure engineering for the photovoltaic power plant.
How to take part
Who can apply
- Minimum annual turnover of 936,000 RON for each of the years 2023, 2024, and 2025
- Experience in completing at least one contract for feasibility studies or technical projects for renewable energy systems with a minimum installed capacity of 6MW in the last 3 years
- Project coordinator/manager with experience in at least one comparable project
- Authorized energy auditor for electroenergetic audits
- Financial specialist with experience in cost-benefit analysis for renewable energy projects
- Implementation of a quality management system (ISO 9001 or equivalent)
- Implementation of an environmental management system (ISO 14001 or equivalent)
What to submit
- Completed DUAE form (Single Economic Operator Declaration)
- Certificate of registration from the Trade Register
- Financial statements for 2023, 2024, and 2025
- Certificates or documents proving experience in comparable projects
- Curriculum Vitae for project coordinator, energy auditor, and financial specialist
- ISO 9001 or equivalent certification for quality management
- ISO 14001 or equivalent certification for environmental management
- Participation guarantee (financial or insurance-based)
- Subcontracting agreement (if applicable)
Award criteria
- Price (40% weight, lowest price receives maximum points)
- Experience of project coordinator (16% weight, up to 16 points for 4+ contracts)
- Experience of authorized energy auditor (8% weight, up to 8 points for 4+ contracts)
- Experience of financial specialist (8% weight, up to 8 points for 4+ contracts)
- Methodology for service delivery (28% weight, up to 28 points for detailed and risk-aware methodology)
Source
Published on SEAP. Original title: Servicii de proiectare - Analiza energetica si studiu de fezabilitate aferente obiectivului de investitii ,,Construire centrala fotovoltaica pentru DRDP-Constanta’’.
Summary and assessment prepared by Pelenoir from the public notice (21 Oct 2026). The original notice and its documents are binding. Page updated 21 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.


