Architecture · Service contract
Övernäs Primary and Lower Secondary School
Procurement of general consultancy services for the planning and design of a new primary and lower secondary school in Övernäs, Mariehamn.
- Deadline
- Closed 33 days ago
- Location
- Mariehamn, Åland, Finland
About the project
Procurement of general consultancy services for the planning and design of a new primary and lower secondary school in Övernäs, Mariehamn. The project includes architectural, engineering, environmental, and technical consultancy services for the school's development.
Scope of work
General consultancy services for the planning and design of Övernäs primary and lower secondary school. The scope includes architectural design, engineering services, environmental consultancy, energy management, acoustic consultancy, and project documentation. The consultant is expected to deliver technical plans, cost estimates, and construction documentation.
Deliverables
- Technical plans and drawings
- Cost estimates and monitoring
- Project documentation
- Permit plans and specifications
- BIM manual
- Reference forms for various roles (architect, electrical, HVAC, etc.)
Required services
- Architectural consultancy
- Engineering services
- Environmental consultancy
- Energy management and savings consultancy
- Acoustic consultancy
- Project management and documentation
Pelenoir assessment
The Övernäs Primary and Lower Secondary School project primarily involves architectural design and engineering services for the planning and development of a new educational building. The scope also includes sustainability and building performance consultancy, as well as project management for the planning phase. The project is multidisciplinary, with a strong focus on design and technical planning.
-
Architecture 40%
Architectural design of the new Övernäs primary and lower secondary school, including conceptual and detailed design, space planning, and integration of educational requirements into the building layout.
-
Engineering 35%
Structural, civil, and building-services engineering for the school, including HVAC, electrical, and acoustic systems, as well as technical plans and cost estimates for construction.
-
Sustainability 15%
Energy management, sustainability assessments, and environmental consultancy to ensure the school meets performance and certification requirements.
-
Project management, documentation, and coordination of the planning and design phases, including cost monitoring and delivery of construction documentation.
How to take part
What to submit
- Completed tender documents
- Reference forms for key roles
- Administrative compliance documents
- European Single Procurement Document (ESPD)
Tender documents
The visible document package includes PDF files likely containing preliminary studies, such as a building history report, a pre-study final report, and acoustic assessments for the school's auditorium and library. There are also technical documents like a BIM manual, project prerequisites, and a list of technical drawings for the school. Reference forms for various consultancy roles (e.g., architect, electrical, HVAC) are provided as DOCX files, alongside administrative regulations and contract drafts. An Excel evaluation template and a European Single Procurement Document (ESPD) are also included. The exact content of these files cannot be confirmed without access, but the filenames suggest they cover project background, technical guidelines, and procurement requirements.
Source
Published on e-Avrop. Original title: Generalkonsultupphandling för projektering av Övernäs låg- och mellanstadieskola i Mariehamn.
Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 24 Sep 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.



