About the project

Renovation of the Ouche Dinier elementary school including energy-efficient upgrades, construction of a new 170-seat elementary school restaurant, and restructuring of the maternal school kitchen. The project also includes the development of 3,140 m² of inclusive and nature-based schoolyards (CNEI) and follows high environmental standards (HQE approach, low-carbon materials, renewable energy, and summer comfort).

Why it matters

Check whether this scope fits your team's experience and the work you want to pursue.

The commissioned scope deserves a closer look before deciding to bid.

For Architects & Design Teams: a useful conversation begins with the scope, before the decision to bid.

Scope of work

Design contest for the renovation and construction of Ouche Dinier schools, including energy-efficient upgrades, new restaurant construction, and inclusive schoolyard development. The project requires a multidisciplinary team (architect, economist, engineering consultants, landscaper, etc.) and follows a high environmental standard (HQE, low-carbon materials, renewable energy). A site visit is mandatory for submission.

Deliverables

  • sketch designs (esquisse)
  • samples or models (maquettes)
  • detailed mission breakdown as per the tender specifications

Required services

  • architectural design
  • cost estimation (economist)
  • kitchen engineering (BET Cuisiniste)
  • structural engineering (BET Structure béton, métal, bois)
  • HQE and bio-sourced materials engineering
  • MEP engineering (BET Fluides)
  • SSI coordination
  • civil engineering (BET VRD)
  • landscape design (Paysagiste-concepteur)
  • acoustic engineering (BET Acousticien)

Pelenoir assessment

The Ouche Dinier Schools Renovation and Construction project is a multidisciplinary design contest focused on architectural design, engineering, landscape architecture, and sustainability. The primary scope involves architectural concept and sketch design for school renovation and new construction, supported by technical engineering, landscape design for inclusive schoolyards, and sustainability measures. The project explicitly requires a consortium with expertise across these disciplines.

  • Architectural design for the renovation of the Ouche Dinier elementary school, construction of a new 170-seat school restaurant, and restructuring of the maternal school kitchen. This includes conceptual and sketch design (esquisse) as the lead discipline in the multidisciplinary team.

  • Structural engineering (concrete, metal, wood), MEP engineering (fluids), civil engineering (VRD), kitchen engineering, acoustic engineering, and SSI coordination for the school renovation and new construction. This also includes technical planning for HQE and bio-sourced materials integration.

  • Design of 3,140 m² of inclusive and nature-based schoolyards (CNEI), including outdoor spaces, planting, and landscape integration for the school environment.

  • Implementation of high environmental standards, including HQE approach, low-carbon materials, renewable energy integration, and summer comfort solutions for the school renovation and new construction.

How to take part

Who can apply

  • multidisciplinary consortium with mandatory competencies (architect as lead, economist, engineering consultants, landscaper, etc.)
  • architects cannot submit multiple bids (individual and consortium)
  • landscapers limited to 5 consortium submissions maximum
  • mandatory site visit for submission eligibility

What to submit

  • electronic submission in French
  • compliance with tender specifications (cahier des charges)
  • samples or models as required by the consultation rules

Source

Published on TED. Original title: France – Architectural services for buildings – Marché de MOE pour le projet de construction et rénovation des écoles Ouche Dinier - avec l'intégration d'une clause d'orientation professionnelle qui consiste à prévoir la mise en place d'immersions professionnelles ou stages au sein de l'entreprise titulaire du marché public.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 8 Oct 2026.