Project and construction management · Service contract
Oslo Infrastructure Cost Calculation Framework
Oslo’s grey, blue, and green projects need cost consultants who can turn uncertainty into traceable decisions.
- Deadline
- Closed 12 days ago
- Location
- Oslo, Norway
- Declared value
- NOK 12 m (≈ EUR 1.1 m)
About the project
Framework agreement for external cost calculation and uncertainty analysis services related to public infrastructure development in Oslo, including grey, blue, and green projects such as streets, pedestrian areas, parks, water management, and underground utilities.
Why it matters
Cost calculation and uncertainty analysis for Oslo’s infrastructure turns the first budget into the first public story of accountability. The eighty percent quality weight on competence means the team’s experience shapes the narrative of execution.
Scope of work
Framework agreement for external cost calculation and uncertainty analysis (P50 and P85) for public infrastructure projects in Oslo, including streets, pedestrian areas, parks, water management, and underground utilities. The contract duration is two years with an option to extend for two additional years (1+1).
Deliverables
- Cost calculations with uncertainty analysis (P50 and P85)
- Reports on cost estimates for infrastructure projects
Required services
- Cost estimation
- Uncertainty analysis
- Project and design preparation
- Infrastructure consulting
Pelenoir assessment
This framework agreement focuses on cost calculation and uncertainty analysis for public infrastructure projects in Oslo, primarily supporting project and construction management activities. A secondary but explicit scope involves technical planning and engineering consulting for infrastructure development.
-
Cost estimation, uncertainty analysis (P50 and P85), and advisory services for public infrastructure projects, including streets, pedestrian areas, parks, water management, and underground utilities.
-
Engineering 20%
Technical consulting and design preparation for infrastructure projects, including underground utilities, water management, and urban development.
How to take part
Who can apply
- Legally established company
- Good economic and financial capacity
- Experience with similar cost calculation and uncertainty analysis projects (minimum three years)
- Quality assurance system (e.g., ISO 9001 or equivalent)
- Environmental management system (e.g., ISO 14001, Miljøfyrtårn or equivalent)
What to submit
- Firm registration certificate (for Norwegian companies: firmaattest; for foreign companies: equivalent registration proof)
- Latest annual financial statements including notes, management report, and audit report
- Description of key deliveries from the last three years, including contract value, delivery date, client name, and project description
- Description of quality assurance methods or certification (e.g., ISO 9001)
- Description of environmental management system or certification (e.g., ISO 14001, Miljøfyrtårn)
Award criteria
- Price (20% weight, based on hourly rates)
- Quality (80% weight, based on competence, experience, and reference reports)
Source
Published on Doffin. Original title: Rammeavtale for kostnadsberegninger og usikkerhetsanalyse.
Summary and assessment prepared by Pelenoir from the public notice (26 Oct 2026). The original notice and its documents are binding. Page updated 26 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.