About the project

Rehabilitation and extension of the Odycea wellness centre, including architectural design services for the existing building's reorganization and new construction.

Why it matters

Check whether this scope fits your team's experience and the work you want to pursue.

Scope of work

Restricted architectural design competition for the rehabilitation and extension of the Odycea wellness centre, including reorganization of the existing building and new construction. The competition is based on esquisse (ESQ+) level design proposals.

Deliverables

  • Architectural design proposals at ESQ+ level
  • Rehabilitation and extension plans for the Odycea wellness centre

Required services

  • Architectural services for buildings

Pelenoir assessment

The project primarily involves architectural design for the rehabilitation and extension of a wellness centre, with a secondary need for technical engineering to support the structural and building-services aspects of the project.

  • Architectural concept, building design, and reorganization of the existing wellness centre, including the design of the extension at ESQ+ (esquisse) level.

  • Technical engineering support for the rehabilitation and extension, including structural and building-services planning to ensure feasibility and compliance with regulations.

How to take part

Who can apply

  • Selection criteria based on qualifications, human and technical resources, and turnover (50% weight)
  • References demonstrating capacity to deliver architectural services (50% weight)

What to submit

  • Submission must be electronic
  • Submission must comply with the competition regulations (cf RC)

Award criteria

  • Qualification and quality of the candidate or team (50% weight)
  • Quality of references provided (50% weight)

Source

Published on TED. Original title: France – Architectural services for buildings – CONCOURS RESTREINT DE MAITRISE D'OEUVRE SUR ESQUISSE + POUR LA REHABILITATION ET L'EXTENSION DU CENTRE DE BIEN ETRE ODYCEA.

Summary and assessment prepared by Pelenoir from the public notice (8 Oct 2026). The original notice and its documents are binding. Page updated 8 Oct 2026.