Engineering · Service contract
Northern Bypass Concept for Tomaszów Mazowiecki
A 2.7 km bypass road’s conceptual design turns drainage and lighting into seamless daily use.
- Deadline
- Closed 12 days ago
- Location
- Tomaszów Mazowiecki, Łódzkie, Poland
- Declared value
- PLN 365 854 (≈ EUR 82 032)
About the project
Development of a conceptual design for a 2.7 km northern bypass road in Tomaszów Mazowiecki, including one bridge or tunnel, intersections, drainage, and lighting. The design must comply with technical and safety standards and assess land acquisition needs.
Why it matters
A ̄ km bypass road’s conceptual design turns drainage, lighting, and land acquisition into seamless daily traffic flow.
Scope of work
Development of a conceptual design for a 2.7 km northern bypass road (class G) in Tomaszów Mazowiecki, including one bridge or tunnel, intersections (roundabout with provincial road DW 713 and standard intersections), drainage, lighting, geotechnical surveys, land acquisition assessment, and cost estimation for the selected variant. The design must comply with technical and safety standards (BRD) and minimize impact on residential areas and protected natural zones.
Deliverables
- Conceptual design for the northern bypass road
- Geotechnical survey report with recommended ground reinforcement
- Assessment of land acquisition needs
- Cost estimation for the selected design variant
- Two preliminary route concepts for client selection
Required services
- Civil engineering design
- Road design (class G parameters)
- Bridge/tunnel design
- Geotechnical investigations
- Traffic safety analysis
- Environmental impact assessment (minimizing disruption to protected areas)
Pelenoir assessment
This project primarily involves the conceptual design of a northern bypass road, requiring civil engineering and technical planning for road infrastructure, including structural elements like a bridge or tunnel. Secondary urban design and planning aspects are also present, focusing on land acquisition and environmental impact mitigation.
-
Engineering 80%
Civil engineering design for the 2.7 km northern bypass road, including structural design for a bridge or tunnel, intersections, drainage, lighting, geotechnical surveys, and compliance with technical and safety standards.
-
Assessment of land acquisition needs, minimization of impact on residential areas and protected natural zones, and integration of the bypass into the existing urban fabric.
How to take part
Who can apply
- Execution of at least two similar road design projects (class G or higher, minimum 2 km each) in the last five years
- Execution of at least two bridge/tunnel/viaduct design projects in the last five years
- Availability of qualified personnel: road designer (unlimited design license, two completed road designs) and bridge designer (unlimited design license, two completed bridge/tunnel designs)
What to submit
- Completed offer form (CZĘŚĆ II SWZ - FORMULARZ OFERTY)
- Statement on non-exclusion and fulfillment of participation conditions (ZAŁ. 1 SWZ)
- For consortia: statement on division of tasks (ZAŁ. 3 SWZ)
- For reliance on third-party resources: commitment statement (ZAŁ. 4 SWZ)
- Power of attorney (if applicable)
Award criteria
- Price (100% weight)
Tender documents
The visible document package includes the full tender specifications (SWZ) in three parts: Part I (general conditions and scope), Part II (offer form), and Part III (contract template). It also contains required submission forms such as declarations on eligibility and non-exclusion (ZAŁ. 1 and ZAŁ. 2), consortium statements (ZAŁ. 3), and subcontractor commitment forms (ZAŁ. 4). The published notice PDF provides the official tender announcement. The files likely detail the technical, legal, and procedural requirements for submitting an offer, but the exact content of the Word and PDF documents cannot be confirmed without access. No drawings, maps, or geotechnical reports are visibly included in the file names.
Source
Published on e-Zamowienia. Original title: Opracowanie koncepcji przebiegu północnej obwodnicy Tomaszowa Mazowieckiego.
Summary and assessment prepared by Pelenoir from the public notice (3 Nov 2026). The original notice and its documents are binding. Page updated 3 Nov 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.