Development of a complete preliminary project for a new waterworks in Arabygdi, including assessment of existing boreholes, new boreholes, water treatment, building and reservoir sizing, pump capacity, pipeline routing, pressure conditions, emergency supply, power supply, control and monitoring systems. The project aims to replace the current waterworks with a secure, robust, and future-oriented solution due to contamination issues with E. coli during heavy rainfall.

Why it matters

A waterworks must deliver clean, safe water every day without interruption, but the engineers decide how to make it reliable.

Scope of work

Consultancy services for a preliminary project to design a new waterworks in Arabygdi, including technical and economic assessments, investigations, calculations, drawings, cost estimates, and a justified recommendation for the solution. The project must enable the municipality to decide on the solution and plan further design and implementation.

Deliverables

  • Technical and economic decision basis
  • Investigations and calculations
  • Drawings
  • Cost estimates
  • Justified recommendation for waterworks solution

Required services

  • Engineering consultancy for water supply infrastructure
  • Geotechnical and geophysical consultancy
  • Environmental impact assessment
  • Project management and planning
  • Risk analysis and emergency planning

Pelenoir assessment

The project is primarily focused on engineering and technical planning for a new waterworks, including infrastructure design, technical assessments, and system planning. A secondary component involves project management to coordinate the preliminary project and prepare a decision basis for the municipality.

  • Technical planning and engineering for water supply infrastructure, including borehole assessment, water treatment, reservoir sizing, pump capacity, pipeline routing, pressure conditions, emergency supply, power supply, and control and monitoring systems.

  • Project management and planning for the preliminary project, including coordination of investigations, cost estimates, risk analysis, and preparation of a decision basis for the municipality.

How to take part

Award criteria

  • Price (30% weight, lowest bid)
  • Competence and experience of proposed personnel (70% weight)

Source

Published on Doffin. Original title: Forprosjekt - Nytt vassverk i Arabygdi.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 9 Oct 2026.