About the project

Construction of a new police headquarters building in Niort, France, including architectural design, functional and technical planning, and environmental integration.

Scope of work

Restricted design competition for the architectural and technical master planning of a new police headquarters building. The competition is structured in two phases: a first phase for candidate selection, followed by a second phase for detailed proposal submission by selected candidates.

Deliverables

  • Architectural design proposals
  • Functional and technical planning documents
  • Environmental and energy integration studies

Required services

  • Architectural design
  • Master planning (Maîtrise d'oeuvre)
  • Technical and functional planning
  • Environmental and energy efficiency consulting

Pelenoir assessment

The project is primarily an architectural design competition for a new police headquarters, with a strong focus on architectural concept and building design. Secondary disciplines include technical planning and sustainability consulting to support the functional, environmental, and energy performance requirements of the facility.

  • Architectural concept, building design, and integration of the new police headquarters, including functional and spatial organization to meet operational requirements.

  • Technical planning, structural engineering, and building services design to ensure the functional and operational requirements of the police headquarters are met.

  • Environmental and energy integration studies, sustainability consulting, and compliance with energy efficiency standards for the building.

How to take part

Who can apply

  • Open to qualified candidates under restricted procedure rules
  • Four candidates will be shortlisted for the second phase
  • Site visit mandatory for shortlisted candidates in the second phase

What to submit

  • Submissions must comply with the competition regulations (Règlement d'Appel à candidature)
  • Documents must be in French

Award criteria

  • Architectural and integration quality (20%)
  • Functional and technical quality (30%)
  • Environmental and energy quality (20%)
  • Planning (10%)
  • Cost compatibility with client budget (20%)

Source

Published on BOAMP. Original title: SGAMI33-2026-28-FCS Concours restreint pour un marché de maîtrise d'oeuvre relatif à la construction du nouvel Hôtel de Police à NIORT (79).

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 2 Oct 2026.