About the project

Design and full construction supervision of a new fire station with integrated emergency dispatch (DGH) function in Temse, including all phases from design to final delivery.

Scope of work

Appointment of an architect to design a new fire station with emergency dispatch function and provide full construction supervision until final delivery. The project includes multidisciplinary coordination, operational and logistical requirements, and compliance with fire safety, sustainability, and building regulations.

Deliverables

  • Architectural design for new fire station with DGH function
  • Full construction supervision until final delivery
  • Multidisciplinary coordination documentation
  • Compliance with fire safety, sustainability, and building regulations

Required services

  • Architectural design
  • Construction supervision
  • Multidisciplinary coordination
  • Technical and operational building design

Pelenoir assessment

The project primarily involves architectural design for a new fire station with an integrated emergency dispatch function, supported by technical engineering and construction supervision. The scope is dominated by architectural and design work, with secondary contributions from engineering and project management disciplines.

  • Architectural concept, building design, and multidisciplinary coordination for the new fire station with integrated emergency dispatch function, including compliance with fire safety, sustainability, and building regulations.

  • Structural, technical, and building-services engineering, including stability, sustainability, and operational systems required for the fire station and emergency dispatch function.

  • Full construction supervision and project management from design to final delivery, ensuring compliance with timelines, budgets, and quality standards.

How to take part

Who can apply

  • Architect must be licensed under Belgian law (Wet van 20 februari 1939)
  • Proof of professional liability insurance and ten-year liability insurance
  • Declaration of no exclusion grounds (criminal convictions, bankruptcy, tax/social security compliance)
  • Bank statement not older than 3 months (model in Annex 11 of KB 18 april 2017)
  • Maximum 5 candidates selected for second phase based on selection criteria
  • Relevant experience: maximum 3 reference projects (minimum €2M construction budget, completed in last 10 years)
  • Project team must include expertise in architecture, technical systems, stability, sustainability, and site supervision

What to submit

  • Participation request form with exclusion grounds declaration (model in Annex A)
  • Bank statement (model in Annex 11 of KB 18 april 2017)
  • Proof of professional liability insurance and ten-year liability insurance
  • Reference fiches for maximum 3 projects (2 A4 pages each, including project description, role, budget, and contact details)
  • Project team organigram with CVs demonstrating relevant experience
  • Evidence of multidisciplinary team collaboration on previous projects
  • Submission in Dutch

Award criteria

  • Quality (100 points): Minimum 60% score required on sub-criteria 3.1.1, 3.1.2, 3.1.3, 3.1.4, and 3.1.5 combined
  • Fee percentage (100 points): All-in price for design and full construction supervision, including VAT

Source

Published on Belgian e-Procurement. Original title: Ontwerp en opvolging bij inrichting voor een nieuwe Brandweerkazerne met DGH-functie te Temse.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 4 Sep 2026.