About the project

Preparation of multi-discipline design documentation for a new five-storey residential building with approximately 8,500 m² of usable space, including ground-floor commercial units, 100 residential units, underground parking, and a civil defense shelter (U1 category). The design must comply with accessibility standards for disabled persons and include energy-efficient solutions.

Scope of work

Preparation of multi-discipline design documentation for a residential building with approximately 8,500 m² usable space, including architectural, structural, mechanical, electrical, and civil defense shelter (U1 category) designs. The project requires compliance with accessibility standards, energy-efficient solutions, and specific residential unit configurations.

Deliverables

  • Multi-discipline design documentation (architectural, structural, mechanical, electrical)
  • Civil defense shelter (U1 category) design
  • Underground parking and storage units design
  • Accessibility-compliant residential units and elevator design

Required services

Pelenoir assessment

The project involves the preparation of multi-discipline design documentation for a residential building, with a primary focus on architectural design, including spatial planning, accessibility, and compliance with universal design standards. Secondary disciplines include structural, mechanical, and electrical engineering for the building and its technical components (e.g., civil defense shelter, underground parking), as well as sustainability and energy-efficiency measures. The scope is explicitly multi-disciplinary, covering architectural, engineering, and performance-related work.

  • Architectural concept and building design for a five-storey residential building, including ground-floor commercial units, 100 residential units, and compliance with accessibility standards for disabled persons.

  • Structural engineering, mechanical and electrical systems (HVAC, plumbing, electrical), and technical planning for the civil defense shelter (U1 category) and underground parking.

  • Energy-efficient solutions and sustainability measures for the residential building, including compliance with performance standards.

How to take part

Who can apply

  • Minimum 3 completed design documentations for buildings with ≥6,000 m² usable space in the last 3 years, including universal design and energy-efficient solutions
  • Design team must include licensed professionals in architecture, structural engineering, mechanical engineering (HVAC/plumbing), and electrical engineering
  • Consortium or joint bidding allowed with designated representative

What to submit

  • Offers submitted electronically via e-Zamówienia platform
  • Documentation in Polish language
  • Proof of experience and qualifications for design team members
  • Evidence of completed comparable projects

Award criteria

  • Price (80% weight)
  • Experience in designing civil defense shelters (20% weight)

Tender documents

The visible document package includes two DOCX files: one labeled 'SWZ wraz z załącznikami' (Specification of Contract Conditions with attachments) and another labeled 'Umowa na usługę projektową ul. Biskupia' (Draft Agreement for design services). The SWZ file likely contains detailed technical requirements, eligibility criteria, submission guidelines, and evaluation methodology for the design documentation. The draft agreement file probably outlines contractual terms, payment conditions, and obligations for the selected design team. The exact content of the attachments or the depth of technical specifications remains unknown, as the files were not downloaded. No drawings, models, or additional technical documents are visibly listed.

Source

Published on e-Zamowienia. Original title: „Opracowanie wielobranżowej dokumentacji projektowej dotyczącej budowy budynku mieszkalnego na działce nr 683 obr. 3 przy ul. Biskupiej w Chełmnie”.

Summary and assessment prepared by Pelenoir from the public notice (20 Oct 2026). The original notice and its documents are binding. Page updated 19 Oct 2026.