About the project
Planning services for the structural securing of the middle dam at Mühlendamm Lock to ensure its stability and functionality.
Why it matters
Structural securing of a dam’s middle ensures its stability, deciding whether the next flood becomes a footnote or a disaster.
Scope of work
Planning services for the structural securing of the middle dam at Mühlendamm Lock, including required technical documentation and submissions.
Deliverables
- planning documents
- technical reports
Required services
- structural engineering
- planning and design
Pelenoir assessment
This project focuses on the planning and technical engineering required for the structural securing of the middle dam at Mühlendamm Lock. The primary scope lies in engineering and technical planning, with secondary involvement of project and construction management to oversee the planning process.
-
Engineering 80%
Structural engineering and technical planning for the securing and stabilization of the middle dam at Mühlendamm Lock, including calculations, design solutions, and technical documentation.
-
Coordination, oversight, and management of the planning process, including compliance with regulatory requirements and integration of technical submissions.
How to take part
What to submit
- participation application (Teilnahmeantrag)
Source
Published on eVergabe Online. Original title: Schleuse Mühlendamm- Planung zur baulichen Sicherung des Mitteldammes.
Summary and assessment prepared by Pelenoir from the public notice (19 Oct 2026). The original notice and its documents are binding. Page updated 19 Oct 2026.
Pelenoir PAL
Find the tenders that fit your practice.
PAL reads every public notice and ranks the opportunities that match your portfolio, team and ambitions.
