About the project

Turnkey construction of a one- or two-storey modular building at Stokmarknes School, including four classrooms, associated special rooms, and internal height of 2.7 metres for up to 70 pupils.

Scope of work

Turnkey construction of a modular school building as a total contract under NS 8407, including design, transport, foundation work, and assembly. The building must accommodate four classrooms and associated special rooms for up to 70 pupils, with an internal height of 2.7 metres and a dirt zone in the entrance.

Deliverables

  • modular building (1 or 2 storeys)
  • four classrooms with associated special rooms
  • internal height of 2.7 metres in classrooms
  • dirt zone in entrance
  • foundation and groundwork
  • transport and assembly of prefabricated modules

Required services

Pelenoir assessment

The project is primarily a turnkey construction contract for a modular school building, with the majority of scope allocated to physical construction, transport, and assembly. Design and technical planning are secondary but explicitly required components, as the tender includes architectural and engineering services under the total contract terms.

  • Turnkey delivery of the modular school building, including physical construction, transport, foundation work, assembly of prefabricated modules, and overall project execution under NS 8407 total contract terms.

  • Design of the modular school building, including spatial planning for classrooms, special rooms, internal height specifications (2.7 metres), and integration of a dirt zone in the entrance.

  • Technical planning for modular construction, including structural engineering for prefabricated modules, foundation design, and coordination of transport and assembly logistics.

How to take part

Who can apply

  • professional risk indemnity insurance

What to submit

  • tender submission in Norwegian
  • electronic submission via procurement platform

Source

Published on Doffin. Original title: Nøkkelferdig oppføring av modulbygg i 1 eller 2 etasjer på Stokmarknes Skole.

Summary and assessment prepared by Pelenoir from the public notice (13 Oct 2026). The original notice and its documents are binding. Page updated 13 Oct 2026.