About the project

Design and construction documentation for modular container laboratories, including necessary administrative approvals and submission of a building permit application.

Scope of work

Preparation of complete design and cost documentation for modular container laboratories, including necessary administrative approvals, permits, and submission of a building permit application. The scope excludes author supervision and obtaining the building permit itself.

Deliverables

  • design documentation (building design, architectural and construction design, technical or execution design)
  • cost calculations and monitoring
  • map for design purposes
  • decision on investment location for public purpose
  • other necessary administrative approvals and permits
  • building permit application submission

Required services

Pelenoir assessment

The project involves the design of modular container laboratories, primarily requiring architectural design for the building and spatial arrangement, complemented by engineering and technical planning for structural and MEP systems. The scope is explicitly divided between architectural and engineering disciplines, with no evidence supporting other AEC business groups.

  • Architectural design of modular container laboratories, including building design, spatial arrangement, and integration of functional requirements for educational and laboratory use.

  • Structural, mechanical, electrical, and plumbing (MEP) engineering for the modular laboratories, including technical and execution design, as well as coordination of engineering systems.

How to take part

Who can apply

  • minimum 2 completed design services for public buildings in the last 5 years, each worth at least PLN 20,000 gross
  • at least one person with unlimited architectural design qualifications
  • at least one person with unlimited structural engineering design qualifications
  • at least one person with unlimited road engineering design qualifications
  • at least one person with unlimited thermal, ventilation, gas, water, and sewage system design qualifications
  • at least one person with unlimited electrical and power engineering system design qualifications

What to submit

  • offers submitted electronically via the procurement platform
  • documents signed with a qualified electronic signature, trusted signature, or personal signature
  • documents in Polish
  • evidence of completed design services (references or other documents from clients, or a contractor's statement if documents cannot be obtained)
  • list of qualified personnel with required design qualifications

Award criteria

  • Price (60%) – calculated as (lowest offer price / evaluated offer price) × 60
  • Shortened completion time (30%) – up to 30 points for reducing the completion time by up to 30 days (1 point per day)
  • Contractual penalty amount (10%) – up to 10 points for proposing a penalty above the minimum 0.5% of total remuneration (maximum 2.5%)

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej kontenerowych laboratoriów modułowych przy ul. Willowej.

Summary and assessment prepared by Pelenoir from the public notice (15 Oct 2026). The original notice and its documents are binding. Page updated 14 Oct 2026.