About the project

Modernization of rooms and construction of an elevator for disabled access at the Powiatowe Centrum Pomocy Rodzinie (PCPR) in Wieluń, including investor supervision for construction and installation works in water supply and electrical systems.

Scope of work

Investor supervision for modernization of PCPR facilities, including construction of an elevator for disabled access, exchange of railings, and modernization of rooms. The contract is divided into two parts: (1) supervision of water supply and sanitary installations, (2) supervision of electrical and power installations. The project is co-financed by the Just Transition Fund under the Regional Programme for Łódź Voivodeship 2021-2027.

Deliverables

  • Investor supervision for construction and installation works in water supply systems (Part 1)
  • Investor supervision for construction and installation works in electrical and power systems (Part 2)

Required services

  • construction supervision (investor supervision)
  • compliance verification with design documentation and regulations
  • coordination of construction and installation works

Pelenoir assessment

This project is classified under PROJECT_AND_CONSTRUCTION_MANAGEMENT as it focuses solely on investor supervision services for the modernization of a public building, including construction and installation works. No architectural design, engineering, or other AEC disciplines are explicitly supported by the extracted scope.

  • Investor supervision for the modernization of PCPR facilities, including construction of an elevator for disabled access, exchange of railings, and modernization of rooms. This includes compliance verification with design documentation and regulations, coordination of construction and installation works, and supervision of water supply, sanitary, electrical, and power installations.

How to take part

Who can apply

  • For Part 1: Supervisor must hold valid construction licenses in water supply and sanitary installations, with experience in at least one similar project.
  • For Part 2: Supervisor must hold valid construction licenses in electrical and power installations, with experience in at least one similar project.
  • Submission of declarations confirming no exclusion grounds under Polish Public Procurement Law (PZP).
  • Submission of personnel lists with qualifications and experience for assigned roles.

What to submit

  • Completed offer form from the e-Zamówienia platform
  • Statutory declarations (e.g., no exclusion grounds, compliance with ICT requirements)
  • Personnel lists with qualifications and experience (Attachments 6a and 6b)
  • Experience records for supervisors (Attachments 9a and 9b)
  • Documents must be signed electronically (qualified signature, trusted profile, or electronic seal)

Award criteria

  • Price (60% weight)
  • Experience of the assigned supervisor in water supply installations (40% weight, Part 1)
  • Experience of the assigned supervisor in electrical and power installations (40% weight, Part 2)

Tender documents

The visible document package contains one file named '2026.11.05. SWZ.docx,' labeled as the main tender documentation (Specyfikacja Warunków Zamówienia, SWZ). Based on the filename and tender context, this file likely includes the full terms of reference, technical specifications, and contractual conditions for the investor supervision services. It probably also contains the required submission forms (e.g., offer templates, personnel lists, and experience records) and detailed eligibility criteria for both contract parts. However, the exact contents of the drawings, detailed plans, or additional technical annexes remain unknown, as only the filename and label were observed.

Source

Published on e-Zamowienia. Original title: Modernizacja pomieszczeń wraz z budową windy dostosowanej do potrzeb osób niepełnosprawnych w siedzibie Powiatowego Centrum Pomocy Rodzinie w Wieluniu – pełnienie nadzoru inwestorskiego.

Summary and assessment prepared by Pelenoir from the public notice (6 Nov 2026). The original notice and its documents are binding. Page updated 5 Nov 2026.