About the project

Supervision of construction works for the energy modernization of an existing public aquatic park, including heating, ventilation and heat pump systems.

Scope of work

Supervision of construction works for the energy modernization of Hajnówka Aquatic Park, including review of design documentation, participation in tender procedures for construction works, and on-site supervision during execution and warranty periods.

Deliverables

  • Reviewed design and cost documentation with equivalence tables and norm updates
  • Written reports on identified errors or inconsistencies in documentation
  • Supervision during construction works execution and warranty period

Required services

Pelenoir assessment

The project involves the energy modernization of an existing aquatic park, with a primary focus on construction supervision (investor's supervision) to oversee the implementation of heating, ventilation, and heat pump systems. A secondary but critical component is the technical verification of engineering design documentation to ensure compliance and accuracy.

  • Supervision of construction works for the energy modernization of the aquatic park, including review of design documentation, participation in tender procedures for construction works, and on-site supervision during execution and warranty periods.

  • Technical verification of design documentation for heating, ventilation, and ground-source heat pump systems, including identification of errors or inconsistencies in engineering plans.

How to take part

Who can apply

  • Experience in supervising construction works involving ground-source heat pumps with a minimum heating capacity of 75 kW
  • Availability of a sanitary systems inspector with unlimited construction licenses and minimum 3 years of experience, including 6 months of supervision in heat pump installations
  • Availability of an electrical systems inspector with unlimited construction licenses and experience in public building projects worth at least PLN 1 million each
  • Availability of a construction inspector with at least limited construction licenses

What to submit

  • Offer in Polish
  • Completed forms and declarations as per tender documentation (SWZ)
  • Documentation proving experience and qualifications of designated personnel

Award criteria

  • Price (60%)
  • Experience of the sanitary systems inspector (40%)

Source

Published on e-Zamowienia. Original title: Pełnienie nadzoru inwestorskiego nad robotami budowlanymi związanymi z realizacją zadania pn. Modernizacja energetyczna Parku Wodnego w Hajnówce II.