About the project

Design documentation and author supervision for the modernization of a county road (DP 1913E) between Ujazd and Wolbórz, including traffic calming elements.

Scope of work

Preparation of design documentation for the modernization of county road DP 1913E (Ujazd–Wolbórz) with traffic calming elements, including author supervision until acceptance of construction works based on the prepared documentation.

Deliverables

  • design documentation for road modernization and traffic calming
  • author supervision during construction

Required services

  • engineering design services (road infrastructure)
  • author supervision (construction oversight)

Pelenoir assessment

This project primarily involves engineering and technical planning for the modernization of a county road, including traffic calming measures. A secondary component is author supervision during construction, which falls under project and construction management. The scope is focused on infrastructure design and oversight, with no indications of architectural, landscape, or urban design work.

  • Design and technical planning for the modernization of the county road DP 1913E, including structural, civil, and infrastructure engineering aspects such as road surface, drainage, signage, and alignment. This also covers the technical integration of traffic calming elements (e.g., speed humps, chicanes, or pedestrian crossings).

  • Author supervision during the construction phase to ensure compliance with the design documentation and provide oversight until the acceptance of construction works.

How to take part

Who can apply

  • execution of at least one similar road design project in the last three years
  • minimum one qualified road design engineer with unlimited design authorization (specialty: road engineering)

What to submit

  • offer form (Załącznik nr 3 do SWZ or equivalent)
  • declaration of no exclusion grounds (art. 125 ust. 1 of Polish Public Procurement Law)
  • list of completed services (Załącznik Nr 7 do SWZ)
  • list of key personnel (Załącznik Nr 8 do SWZ)
  • documents confirming legal representation (if not publicly available)

Award criteria

  • Price (60% weight)
  • Experience of key personnel (40% weight)

Tender documents

The visible ZIP file (ZDP.3801.43.2026 SWZ.zip) likely contains the full tender documentation package, including the Specyfikacja Warunków Zamówienia (SWZ). This typically includes the detailed description of the project scope, technical requirements for road modernization and traffic calming, contract terms, submission forms (e.g., offer templates, declaration forms), and evaluation criteria. The package may also include appendices such as reference templates for past project lists or personnel qualifications. The exact contents of the ZIP cannot be confirmed without access, but the file name and context suggest it is the primary tender documentation for this procurement.

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowej oraz pełnienie nadzoru autorskiego dla zdania pn.: „Modernizacja DP 1913E Ujazd – Wolbórz wraz z elementami uspokojenia ruchu. ”.

Summary and assessment prepared by Pelenoir from the public notice (22 Oct 2026). The original notice and its documents are binding. Page updated 21 Oct 2026.