About the project

Supervision services for the design and execution phases of the modernization of DN71 road, including widening to four lanes (km 0+000–km 44+130) and two-lane roadworks (km 51+041–km 109+905) between Târgoviște and Sinaia. The project also covers the warranty period and ensures compliance with contractual obligations regarding duration, quantity, quality, and cost.

Scope of work

Supervision services for the design, execution, and warranty phases of DN71 road modernization, ensuring compliance with contractual obligations, quality standards, and cost control. The scope includes monitoring the contractor’s performance, verifying design and execution alignment with contractual terms, and managing potential contract modifications.

Deliverables

  • Supervision reports for design and execution phases
  • Quality and quantity compliance verification
  • Progress monitoring and cost control documentation
  • Warranty period supervision reports

Required services

  • Supervision of design and execution works
  • Quality assurance and control
  • Quantity verification and certification
  • Contract compliance monitoring
  • Warranty period supervision

Pelenoir assessment

The project is primarily a project and construction management assignment for the modernization of a national road, with a secondary focus on engineering and technical verification of design and execution compliance. The scope centers on supervision, quality control, and contract management rather than direct design or construction delivery.

  • Supervision of design and execution phases for the DN71 road modernization, including quality assurance, quantity verification, contract compliance monitoring, and warranty period supervision.

  • Technical verification of road design, structural engineering compliance, and alignment with contractual and regulatory standards during the supervision process.

How to take part

Who can apply

  • Minimum annual turnover of 4,000,000 RON for 2023–2025
  • Completion of at least 5 similar supervision/consultancy contracts in the last 5 years, with a cumulative value of 8,000,000 RON (excluding VAT)
  • Implementation of a quality management system (ISO 9001 or equivalent)
  • No exclusion grounds under Romanian public procurement law (e.g., insolvency, tax debts, professional misconduct)
  • Submission of Declarations on Oath for Absence of Conflict of Interest (Formularul E)

What to submit

  • Completed DUAE (Declaration and Undertaking on Economic Operator Status) form
  • Curriculum Vitae for key personnel (Annex 1 to Form 4)
  • Certificates of completion for similar contracts (e.g., reception reports, certificates of good execution)
  • ISO 9001 or equivalent quality management certification
  • Financial statements for 2023–2025
  • Association agreement (if applicable)
  • Subcontracting agreements (if applicable)
  • Signed offer and supporting documents in Romanian

Award criteria

  • Price (35% weight)
  • Experience of Contract Coordinator (10% weight)
  • Experience of Road Construction Engineer (5% weight)
  • Experience of Structures Engineer (5% weight)
  • Experience of Quality Assurance Engineer (8% weight)
  • Service delivery methodology (22% weight)
  • Experience of Quantity Engineer (7% weight)
  • Resource planning adequacy (8% weight)

Source

Published on SEAP. Original title: Servicii de Supervizare Proiectare si Executie „Modernizare DN71 Baldana – Targoviste – Sinaia, km 0+000 – km 44+130 largire la 4 benzi de circulatie si km 51+041 – km 109+905 drum la doua benzi, Sector 2: Targoviste – Sinaia km 51+041 – km 109+905 drum la 2 benzi de circulatie”.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 19 Aug 2026.