About the project

Preparation of complete design and cost documentation for the modernisation of a bridge on Jana Pawła II Street in Wronki, including structural assessments, geotechnical investigations, variant repair analyses, and obtaining all required administrative approvals. The project is divided into three stages: stabilisation of bridge supports, repair of the span with replacement of expansion joints, and resurfacing of walkways and approach roads.

Scope of work

Preparation of design and cost documentation for the modernisation of a bridge, including structural diagnostics, geotechnical investigations, repair variant analyses, and obtaining all required administrative approvals. The project is divided into three stages: stabilisation of supports, repair of the span, and resurfacing of walkways and approach roads. The deliverables include a construction design (PZT, PAB, PT), traffic organisation plan, technical specifications, bills of quantities, and cost estimates for each stage.

Deliverables

  • Construction design (PZT, PAB, PT)
  • Temporary traffic organisation plan
  • Technical specifications for execution and acceptance of construction works
  • Bills of quantities
  • Investor's cost estimate
  • Contractor's cost estimate (for all stages separately)

Required services

  • Structural diagnostics and assessment
  • Geotechnical investigations (including boreholes from water level at river piers)
  • Material testing of the structure
  • Static and strength analysis of the Gerber structure considering support displacements
  • Variant analysis of possible repair solutions
  • Obtaining administrative approvals (e.g., building permit or notification of construction works)
  • Coordination with infrastructure network managers, heritage conservation authorities, and water management authorities
  • Author's supervision during construction

Pelenoir assessment

The project focuses on the modernisation of a bridge, primarily involving engineering and technical planning for structural diagnostics, geotechnical investigations, and design documentation. Secondary aspects include project management for administrative approvals and coordination, as well as surveying for geotechnical data collection.

  • Structural diagnostics, geotechnical investigations, static and strength analysis of the bridge (Gerber structure), variant repair analyses, and preparation of construction design documentation (PZT, PAB, PT) for the modernisation of the bridge.

  • Coordination with infrastructure network managers, heritage conservation authorities, and water management authorities, as well as obtaining administrative approvals (e.g., building permit or notification of construction works).

  • Geotechnical investigations, including boreholes from the water level at river piers, and measurement-related tasks for the bridge structure.

How to take part

Who can apply

  • Contractor must demonstrate availability of personnel with valid construction design licenses in road and bridge engineering (or equivalent)
  • Contractor must submit a list of personnel assigned to the project, including their qualifications and experience

What to submit

  • Offer form (Załącznik 1 do SWZ)
  • Statement on meeting participation conditions and absence of exclusion grounds (art. 125 ust. 1 of the Polish Public Procurement Law)
  • Excerpt from the National Court Register or Central Register of Economic Activity
  • List of personnel assigned to the project (Załącznik 4 do SWZ)
  • Documents confirming the authority of persons acting on behalf of the contractor
  • Self-cleaning statement (if applicable)
  • Commitment of third-party resource providers (if applicable)
  • Power of attorney (if applicable)
  • Statement of joint bidders (if applicable)
  • Confidentiality reservation (if applicable)

Award criteria

  • Price (60% weight)
  • Experience of the bridge engineering designer (40% weight)

Source

Published on e-Zamowienia. Original title: Wykonanie dokumentacji projektowo – kosztorysowej branży mostowej dla zadania pn. „Modernizacja obiektu mostowego – ul. Jana Pawła II w m. Wronki”.

Summary and assessment prepared by Pelenoir from the public notice (11 Nov 2026). The original notice and its documents are binding. Page updated 10 Nov 2026.