About the project

Expansion and renovation of the Mittelschule Groß Sankt Florian, including general planning services excluding technical equipment. The planning must be closely coordinated with the client's project team, site supervision, future specialist planners, and contractors.

Scope of work

General planning services for the expansion and renovation of the Mittelschule Groß Sankt Florian, excluding technical equipment. The services must be closely coordinated with the client's project team, site supervision, specialist planners, and contractors.

Deliverables

  • General planning services

Required services

Pelenoir assessment

The project primarily involves architectural design and general planning for the expansion and renovation of a public school, with secondary requirements for structural/civil engineering and project coordination. The scope explicitly excludes technical equipment, focusing instead on building design, engineering (non-MEP), and multidisciplinary planning integration.

  • Architectural concept, building design, and general planning for the expansion and renovation of the Mittelschule Groß Sankt Florian, including spatial organization, façade design, and compliance with educational building standards.

  • Structural engineering, civil engineering, and technical planning for the building's expansion and renovation, excluding technical equipment (e.g., HVAC, electrical). This includes load-bearing structures, foundation design, and compliance with building codes.

  • Coordination of the planning process, client representation, and integration of inputs from specialist planners and contractors during the expansion and renovation project.

How to take part

Who can apply

  • Suitable for small and medium-sized enterprises (SMEs)
  • Procedure conducted in multiple phases with exclusion of some participants
  • Maximum of 5 bidders invited to the second phase

What to submit

  • Submission in German
  • Electronic submission required

Source

Published on Austrian Public Procurement Search. Original title: Zu- und Umbau sowie Sanierung der Mittelschule Groß Sankt Florian – Generalplanungsleistungen ohne technische Ausrüstung.

Summary and assessment prepared by Pelenoir from the public notice (14 Oct 2026). The original notice and its documents are binding. Page updated 13 Oct 2026.