About the project

Design and project management for the creation of a new main entrance gate at Montbéliard Prison, including architectural, technical, and coordination services for the construction of the entrance.

Scope of work

Project management services for the design and construction of a new main entrance gate at Montbéliard Prison, including base missions of project management (Maîtrise d'Oeuvre).

Deliverables

  • Architectural and technical designs for the main entrance gate
  • Project coordination and management documentation

Required services

Pelenoir assessment

This project primarily involves the architectural design of a new main entrance gate for a prison facility, supported by technical engineering and project management services. The scope is dominated by architectural and design work, with secondary contributions from engineering and construction management disciplines.

  • Architectural design of the new main entrance gate, including conceptual and detailed design, aesthetic integration with the existing prison facility, and compliance with security and functional requirements.

  • Technical studies and engineering for the entrance gate, including structural integrity, security infrastructure, and integration of technical systems (e.g., access control, surveillance).

  • Project coordination, construction supervision, and management of the design and build process to ensure compliance with client requirements and regulatory standards.

How to take part

Who can apply

  • Compliance with French public procurement regulations
  • No exclusion grounds (épuration des candidatures)
  • SMEs eligible (SMESuitableIndicator: true)

What to submit

  • Electronic submission required
  • Confidential documents accessible via restricted portal (DISPDIJ26007 DOCS CONFIDENTIELS)

Award criteria

  • Environmental criteria mentioned in tender

Source

Published on BOAMP. Original title: Maîtrise d'Oeuvre de création d'une porte d'entrée principale.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 30 Sep 2026.