About the project

Preparation of two local zoning plans: one for renewable energy installations (wind farms, photovoltaics, energy storage) and related infrastructure, and another for selected areas of Chachalnia village. Both plans include required analyses, forecasts, planning documentation, and procedural steps such as public consultations, opinions, and approvals.

Scope of work

Preparation of two local zoning plans: (1) a plan for renewable energy installations (wind farms, photovoltaics, energy storage) and related infrastructure, including environmental impact assessments and procedural steps; (2) a plan for selected areas of Chachalnia village, covering multiple plots and village sections, with full planning documentation and public consultation procedures.

Deliverables

  • draft local zoning plans
  • required analyses and forecasts
  • planning documentation
  • environmental impact assessments (for renewable energy plan)
  • procedural documentation (opinions, agreements, public consultations)

Required services

  • urban planning
  • spatial planning
  • environmental impact assessment
  • public consultation coordination
  • legal and procedural compliance

Pelenoir assessment

This project involves the preparation of local zoning plans for renewable energy infrastructure and village development in Zduny, Poland. The primary focus is on urban design and spatial planning, including land-use allocation, procedural compliance, and public consultations. A secondary but critical component is the environmental impact assessment and sustainability analysis for the renewable energy plan.

  • Preparation of two local zoning plans: one for renewable energy installations (wind farms, photovoltaics, energy storage) and related infrastructure, and another for selected areas of Chachalnia village. This includes spatial planning, land-use allocation, procedural compliance, and coordination of public consultations and approvals.

  • Environmental impact assessments and sustainability considerations for the renewable energy zoning plan, including compliance with Polish environmental laws and public participation requirements.

How to take part

Who can apply

  • Minimum 5 years of experience for the lead urban planner (chief designer) under Polish spatial planning law
  • Experience in preparing at least one local zoning plan for wind farms, including environmental impact assessment, with the plan adopted by a municipal council (for Part 1)
  • Compliance with Polish environmental information and public participation laws (for both parts)

What to submit

  • Offer form
  • Statements on exclusion and eligibility criteria
  • List of subcontractors (if applicable)
  • Tax obligation declaration
  • Documentation of past experience (references, contracts, or statements)
  • List of personnel assigned to the project with qualifications and experience
  • Power of attorney (for joint bidders)

Award criteria

  • Price (60%)
  • Quality, including technical parameters, aesthetic and functional features such as accessibility for disabled persons or user needs (40%)
  • Deadline for introducing corrections (40% for each part)

Source

Published on e-Zamowienia. Original title: Opracowanie miejscowych planów zagospodarowania przestrzennego na terenie gminy Zduny.

Summary and assessment prepared by Pelenoir from the public notice (14 Nov 2026). The original notice and its documents are binding. Page updated 13 Nov 2026.