About the project

Construction design for a new double-track railway between Kempele and Oulu, including track geometry, geotechnical and drainage design, bridges, culverts, environmental planning, electrical systems, and platform design for Kempele station.

Scope of work

Construction design services for the Liminka-Oulu double-track railway section Kempele-Oulu, including track geometry, geotechnical and drainage design, 7 bridges, 25 culverts, environmental planning (noise, vibration, groundwater, acidic sulphate soils), electrical systems (lighting, switch heating), and design of Kempele station's second platform. Optional design services for construction-phase planning (2028-2032) and Ketolanperä road underpass (km 739+750-740+700).

Deliverables

  • track geometry design
  • geotechnical design
  • drainage design
  • bridge construction design (7 units)
  • culvert construction design (25 units)
  • environmental planning (noise, vibration, groundwater, acidic sulphate soils)
  • electrical systems design (lighting, switch heating)
  • Kempele station second platform design
  • coordination with safety signalling, drainage modification, and local train station designs

Required services

  • construction design
  • geotechnical engineering
  • drainage engineering
  • bridge engineering
  • environmental planning
  • electrical engineering for railways

Pelenoir assessment

This project primarily involves engineering and technical planning for a new double-track railway, including structural, geotechnical, drainage, bridge, and electrical systems design. Secondary disciplines include urban and environmental planning for noise, vibration, and groundwater management, as well as project and construction management for coordination and optional construction-phase services.

  • Construction design for track geometry, geotechnical and drainage systems, bridges, culverts, electrical systems (lighting and switch heating), and coordination with safety signalling and drainage modifications.

  • Coordination of construction design activities, alignment with safety signalling and drainage modifications, and potential construction-phase planning services (2028-2032).

  • Environmental planning for noise, vibration, groundwater, and acidic sulphate soils, as well as integration with local train station designs.

How to take part

Who can apply

  • participation limited to qualified candidates selected in the first stage of the restricted procedure
  • confidentiality agreement required for access to restricted documents
  • signed security commitment and personal confidentiality agreements required for handling confidential information

What to submit

  • participation request (osallistumishakemus)
  • signed project-specific security commitment
  • signed personal confidentiality agreements for individuals handling confidential information

Award criteria

  • Price 100%

Source

Published on HILMA. Original title: Osallistumispyyntö, Liminka-Oulu kaksoisraide, rakentamissuunnittelu Kempele - Oulu.

Summary and assessment prepared by Pelenoir from the public notice (15 Oct 2026). The original notice and its documents are binding. Page updated 15 Oct 2026.