About the project

Framework agreements for multidisciplinary design, third-party verification and independent control services covering all project phases for light rail, tunnels, bridges, roads, technical infrastructure, architecture, landscape, environment, health and safety, BIM and digital collaboration. The agreements may be called off by Bybanen Utbygging, Bybanen AS and Eigedom og Utbygging (Property and Development).

Scope of work

Framework agreements for multidisciplinary design, third-party verification (NS standards) and independent control (pbl regulations) services across all project phases for light rail, tunnels, bridges, roads, technical infrastructure, architecture, landscape, environment, health and safety, BIM and digital collaboration. The framework allows for direct call-offs and mini-competitions. Services may require partial or full on-site presence in Bergen, Norway.

Deliverables

  • completed price schedule document
  • resource coverage matrix per discipline (Ressursdekning per fagområde)
  • statement on resource capacity and availability (max 4 pages)
  • methodology statement on task understanding and execution (max 3 pages)

Required services

  • design and engineering services
  • third-party verification (NS standards)
  • independent control (pbl regulations)
  • architectural design
  • landscape architecture
  • environmental services
  • health, safety and environment (HMS/SHA)
  • BIM and digital collaboration
  • project management
  • technical inspection of structures
  • structural engineering verification

Pelenoir assessment

This framework agreement primarily supports multidisciplinary engineering and technical planning for light rail and associated infrastructure, including third-party verification and independent control. Secondary disciplines include architectural design, landscape architecture, BIM and digital delivery, sustainability and building performance, and project management. The scope is explicitly defined by the tender's required services, typologies, and evaluation criteria, covering all project phases for civil, structural, and technical engineering, with additional focus on design, digital coordination, and environmental integration.

  • Structural, civil, and technical engineering for light rail, tunnels, bridges, roads, and technical infrastructure, including third-party verification and independent control services under NS standards and pbl regulations.

  • Architectural design for light rail stations, associated buildings, and infrastructure elements, including conceptual and detailed design across all project phases.

  • Landscape design for light rail corridors, stations, and surrounding open spaces, including planting, outdoor environments, and integration with urban contexts.

  • BIM coordination, digital collaboration, information management, and computational delivery for multidisciplinary design and verification processes.

  • Climate and environmental considerations integrated into design, verification, and control processes, including sustainability assessments and certification support.

  • Project management, client representation, and construction supervision for multidisciplinary design and verification services across all project phases.

How to take part

Who can apply

  • open to suppliers from EEA countries
  • framework agreement covers up to 5 participants
  • minimum 6 and maximum 8 candidates to be invited to the second stage of the procedure
  • no reserved participation for sheltered workshops or social enterprises
  • no mandatory disclosure of staff names and qualifications

What to submit

  • electronic submission only
  • documents in English or Norwegian
  • electronic catalogues permitted
  • no variants allowed
  • only one tender per supplier allowed

Award criteria

  • Price (35–45%): evaluated based on weighted hourly rates per staff category
  • Delivery capacity and resource availability per discipline (20–30%): assessed through a resource coverage matrix and a statement on capacity, response time and handling of fluctuations
  • Task understanding and execution methodology (25–35%): assessed through a methodology statement integrating climate and environmental considerations

Source

Published on Doffin. Original title: R06 Rammeavtale for prosjekteringstjenester.

Summary and assessment prepared by Pelenoir from the public notice (26 Nov 2026). The original notice and its documents are binding. Page updated 25 Nov 2026.