About the project

Development of complete multi-discipline design documentation for the construction of a new public utility building integrating administrative, social, cultural and service functions, including site development, technical infrastructure and a protective structure, along with authorial supervision of the investment.

Scope of work

Development of complete multi-discipline design documentation (architectural, structural, mechanical, electrical, plumbing) for a new public utility building with administrative, social, cultural and service functions, including site development, technical infrastructure, a protective structure and authorial supervision. Submission must include all required design documents, forms and evidence of qualifications.

Deliverables

  • complete multi-discipline design documentation
  • site development plans
  • technical infrastructure designs
  • protective structure designs
  • authorial supervision documentation

Required services

Pelenoir assessment

The project primarily involves the design of a new public utility building with integrated administrative, social, cultural, and service functions, supported by architectural and engineering disciplines. The scope also includes site development and technical infrastructure planning, justifying a multi-discipline AEC classification with a focus on architecture, engineering, and urban design.

  • Development of the architectural concept, building design, and integration of administrative, social, cultural, and service functions for the public utility building, including coordination of multi-discipline design documentation.

  • Structural, mechanical (HVAC, plumbing, gas), electrical, and technical infrastructure engineering design for the building and site development, including the protective structure.

  • Site development planning, including spatial integration of the public utility building, protective structure, and technical infrastructure within the project location.

How to take part

Who can apply

  • minimum 2 completed projects in the last 5 years for public utility buildings valued at least PLN 100,000 gross
  • personnel with valid construction design licenses in structural, mechanical and electrical disciplines
  • consortium members must submit joint authorization and individual compliance declarations

What to submit

  • offer submitted via electronic platform the original notice
  • documents in Polish
  • electronic formats: txt, rtf, pdf, xps, odt, ods, odp, doc, xls, pptx, csv, jpg, jpeg, tif, tiff, geotiff, png, svg, wav, mp3, avi, mpg, mpeg, mp4, m4a, mpeg4, ogg, ogv, zip, tar, gz, gzip, 7z, html, xhtml, css, xml, xsd, gml, rng, xsl, xslt, TSL, XMLsig, XAdES, CAdES, ASIC, XMLenc
  • files up to 100 MB each
  • UTF-8 encoding
  • compliance with Polish public procurement document regulations

Award criteria

  • Price (60% weight)
  • Experience of the designer with structural engineering license (40% weight)

Source

Published on e-Zamowienia. Original title: Opracowanie kompletnej, wielobranżowej dokumentacji projektowej niezbędnej do przygotowania i realizacji inwestycji pn. ,,Budowa obiektu użyteczności publicznej wraz z Ukryciem”,.

Summary and assessment prepared by Pelenoir from the public notice (22 Oct 2026). The original notice and its documents are binding. Page updated 22 Oct 2026.