About the project

Continuation of the operation, management, and data interpretation of an existing groundwater monitoring network for the KIJK dike reinforcement project. The network provides essential groundwater level data to support technical design, execution, and risk management decisions during the project's construction phase.

Scope of work

Operation, management, and data interpretation of an existing groundwater monitoring network for the KIJK dike reinforcement project. The contractor must ensure reliable network functionality, consistent data processing, and high-quality information delivery to support technical analyses, risk management, and decision-making throughout the project's execution phase.

Deliverables

  • Reliable functioning groundwater monitoring network
  • Consistent processing and interpretation of groundwater measurement data
  • High-quality information for technical analyses and risk management

Required services

  • Monitoring and control services
  • Data processing and interpretation
  • Technical support for groundwater management

Pelenoir assessment

This project is primarily focused on the technical operation and management of a groundwater monitoring network to support a dike reinforcement initiative. The scope is dominated by engineering and technical planning activities, with a secondary emphasis on surveying and geomatics for data collection and measurement.

  • Technical operation, management, and data interpretation of the groundwater monitoring network to support the KIJK dike reinforcement project. This includes ensuring the reliability of the network, processing measurement data, and delivering actionable insights for technical design and risk management during construction.

  • Surveying 30%

    Monitoring and measurement of groundwater levels, including the maintenance and calibration of geodetic instruments (e.g., piezometers) and the collection of geospatial data to support the engineering analyses.

How to take part

Who can apply

  • Compliance with Uniform European Procurement Document (UEA) requirements
  • Eligibility criteria as defined in the tender documents

What to submit

  • Tender submission in Dutch
  • Electronic submission via TenderNed platform
  • Compliance with specified formats and document requirements

Award criteria

  • Quality (80% weight)
  • Price (20% weight)

Tender documents

The visible document package includes tender notices, instructions for submission, and technical annexes. Files such as 'Beknopte inventarislijst peilbuizen KIJK.pdf' and 'Informatie over peilbuizen KIJK.pdf' likely contain inventories and technical details of the existing groundwater monitoring network. 'Bijlage 6 Programma van Eisen.pdf' probably outlines the technical and operational requirements for the monitoring services. Legal and contractual documents, including 'Bijlage 1 Concept Overeenkomst Diensten.pdf' and '2026.14102 Inschrijvingsleidraad Grondwatermeetnet KIJK.pdf', specify the terms, conditions, and procedural guidelines for tender submission and contract execution. The content of the files remains uncertain without direct access, but the filenames suggest a focus on technical, legal, and procedural aspects of the procurement.

Source

Published on TenderNed. Original title: Grondwatermeetnet ten behoeve van project KIJK.

Summary and assessment prepared by Pelenoir from the public notice (7 Oct 2026). The original notice and its documents are binding. Page updated 22 Sep 2026.