About the project

Design services for high-voltage electrical power distribution infrastructure, including substations and transmission lines across multiple regions in Hungary. The project involves detailed engineering design for 110 kV and above substations, transformers, and transmission lines, as well as environmental and safety planning for protected species.

Scope of work

Design services for high-voltage electrical infrastructure, including substations and transmission lines. The scope covers technical, architectural, telecommunications, and environmental planning, as well as compliance with Hungarian and EU regulations.

Deliverables

  • Technical design documentation for substations and transmission lines
  • Draft contracts
  • Environmental impact assessments and species protection plans
  • Compliance documentation for regulatory approvals

Required services

  • Electrical power systems design services
  • Engineering design services
  • Architectural and telecommunications design for substations
  • Environmental planning and protected species management

Pelenoir assessment

This project primarily involves engineering and technical planning for high-voltage electrical infrastructure, with secondary components in environmental sustainability and architectural design for substations. The focus is on delivering detailed technical designs, compliance documentation, and environmental protection measures for substations and transmission lines across multiple regions in Hungary.

  • Detailed engineering design for high-voltage substations, transformers, and transmission lines, including structural, electrical, and infrastructure planning for 110 kV and above systems.

  • Environmental impact assessments, species protection planning, and compliance with environmental regulations for high-voltage infrastructure.

  • Architectural design for substations, including spatial planning and integration of telecommunications systems within the infrastructure.

How to take part

Who can apply

  • Enrolment in a relevant professional register (Hungarian or equivalent foreign professional chamber)
  • Proven experience in high-voltage substation and transmission line design (minimum 10 million HUF for substations, minimum 5 km for transmission lines)
  • Qualified personnel with specific professional certifications (e.g., EN-VI, T, GT, HI-V, V, É)
  • Compliance with Hungarian public procurement regulations (Kbt. 65. §, 321/2015. Korm. rendelet)

What to submit

  • Technical and financial proposals
  • References for similar completed projects
  • Professional qualifications and certifications of key personnel
  • Environmental and safety compliance documentation

Award criteria

  • 1. Net contractor fee (including option rights)
  • 2. Number of additional designers with specified competencies (0-2)
  • 3. Additional professional experience of key personnel (0-36 months beyond minimum requirements)
  • 4. Commitment to include environmental protection measures in design documentation (yes/no)
  • 5. Commitment to include protected species rescue tasks in design documentation (yes/no, for relevant lots)

Tender documents

The visible document package includes 28 files, primarily labeled as technical documentation for various parts of the project (e.g., 'Műszaki dokumentáció 1. rész' to '12. rész'). These files likely contain detailed technical specifications, design requirements, and environmental planning guidelines for high-voltage substations and transmission lines. One file, 'Hüllők kétéltűek biztonságos eltávolítása_kiadásra.pdf,' suggests specific environmental protection measures for reptiles and amphibians. The 'Szerződéstervezetek' file likely contains draft contract terms, while 'Közbeszerzési dokumentáció' probably includes procurement forms and submission guidelines. The exact content of each file remains uncertain without access, but the titles indicate a focus on technical, contractual, and regulatory compliance documentation.

Source

Published on EKR. Original title: Főelosztóhálózati tervezés - 1. csomag.

Summary and assessment prepared by Pelenoir from the public notice (9 Oct 2026). The original notice and its documents are binding. Page updated 14 Sep 2026.